Laserfiche WebLink
City of Pleasanton <br />30 April 2025 <br />Page 6 <br /> <br />Subtask 3.4 – Quantify and Describe System Water Supplies and Water Sources, Existing and Projected <br />(CWC §10631; §10633; §10635) <br />Based on information provided by the City and Zone 7, the 2025 UWMP will incorporate information <br />regarding the source, nature, and projected availability of the City’s current and projected future water <br />supplies on an annual basis in five-year increments through 2050. The 2025 UWMP will update pertinent <br />information for each of the water sources, including, but not limited to: <br />• Purchased Water (i.e. from Zone 7): (1) updates on contracts such as expiration or renewal dates; <br />(2) water quality issues; (3) limitations; and (4) other conditions. <br />• Groundwater: (1) updates on recent/current availability of Pleasanton’s local groundwater <br />supply; and (2) anticipated groundwater production over the UWMP planning horizon. <br />• Wastewater and Recycled Water (i.e., from DERWA1): (1) volume of wastewater collected with <br />the service area; (2) recycled water level of treatment; and (3) recycled water end use (i.e., non- <br />potable irrigation). <br />• Additional Sources of Water: Based on availability of data, quantify potential new sources of water <br />supply that may become available during the 2025 UWMP planning horizon, including planned <br />potable reuse, if any. <br />• Climate Change Impact to Supply: Incorporate changes in supply due to climate change based on <br />information from existing climate change studies or climate change analyses, as available from <br />Zone 7 or included in State Water Project (SWP) documents. EKI will address climate change in <br />accordance with the forthcoming 2025 UWMP Guidebook recommendations. <br />Subtask 3.5 – Update Water Supply Reliability Assessment (CWC §10635) <br />Based on information provided by the City and Zone 7, EKI will evaluate supply reliability and/or <br />constraints of the available supplies and evaluate the sufficiency of the available supplies to meet the <br />demands identified in Subtask 3.2. EKI will compare the total projected water supply to projected water <br />demand in five-year increments for the next 25 years, for normal, dry, and a period of five dry years. To <br />the extent that there are significant shortfalls or uncertainties identified, EKI will bring these issues to the <br />City’s attention so that they can be addressed prior to drafting the Administrative Draft UWMP. <br />EKI will prepare a Drought Risk Assessment assuming a near-term drought period that lasts five <br />consecutive years to meet the drought risk assessment requirement as well as to support the AWSDA <br />process. <br />Subtask 3.6 – Describe Demand Management Measures (CWC §10631) <br />EKI will work with City staff to incorporate appropriate water conservation information into the 2025 <br />UWMP based on the Demand Management Measure (DMM) framework required per AB 2067 and CWC <br />§10631. EKI has assumed that records of the City’s historical and projected future water conservation <br />programs and actions will be available from the City, specifically with respect to: <br />• Water waste prevention ordinances; <br /> <br />1 The Dublin San Ramon Services District (DSRSD) and East Bay Municipal Utility District (EBMUD) Recycled Water <br />Authority (DERWA) is a joint powers authority governed by DSRSD and EBMUD. The City joined the partnership in <br />2014. <br />EXHIBIT A <br />Docusign Envelope ID: C661CF75-4987-4828-A8C7-DB4BC31D3C52