Laserfiche WebLink
Page 5 of 11 <br /> <br />The current annual assessment of $16.62 per parcel is no longer sufficient to cover necessary <br />maintenance, emergency repairs, or long-term capital improvements. While the overall <br />assessment revenue currently supports basic maintenance and operational costs—including <br />water, electricity, and administrative fees—it is inadequate for more extensive needs such as <br />system upgrades, plant replacements, and emergency repairs. <br /> <br />The district faces an immediate annual funding shortfall of approximately $3,200 for minimum <br />maintenance operations. Additionally, the Proposition 218 process to pursue a rate increase <br />will cost approximately $36,000, bringing the total projected reserve draw to approximately <br />$32,400 for the current fiscal year. <br /> <br />The capital repair and replacement reserve fund balance is approximately $81,000 but <br />estimated capital needs over the next ten years total approximately $600,000. These needs <br />include full replacement of the irrigation system, plant and tree replacements, pruning, <br />masonry wall repairs, and consultant services. <br /> <br />To address this funding gap, staff recommends restoring the assessment to the level of $60.08 <br />per parcel (or $61.10 per parcel including the 1.7% county fee), as authorized by the City Council and <br />adopted by Resolution 88-375. This adjustment can be implemented without a Proposition 218 <br />property owner vote and would provide critical near-term relief. <br /> <br />Following the restoration of the assessment to 1988 levels, staff further recommends initiating <br />a Proposition 218-compliant process to seek property owner approval for: <br />• An increase to approximately $150 per parcel annually, and <br />• An annual inflation escalator to ensure the district remains financially sustainable over <br />time. <br /> <br />If the Proposition 218 property owner vote does not pass, staff will be forced to implement <br />cost-reduction measures, including the permanent shutoff of portions of the irrigation system. <br />This will lead to accelerated landscape deterioration, increased long-term repair costs, and <br />higher liability exposure for the City. <br /> <br />Staff believes the recommended actions represent a responsible and necessary approach to <br />maintaining service levels, protecting community assets, and ensuring the long-term <br />sustainability of District 1984-1. <br /> <br />Landscape Maintenance District 1993-1, Windsor <br />Landscaping Maintenance District 1993-1, established in 1993, provides for the maintenance <br />of public landscaping within the Windsor Subdivision. The scope of maintenance includes <br />masonry walls, trees, shrubbery, groundcover, irrigation systems, entry features, and common <br />area drainage ditches. The district also funds all water and electricity associated with <br />irrigation. These improvements are located within Lot A (northeast side of Tapestry Way and <br />Minton Court, and the northwest corner of the subdivision) and Lot C (southwest corner of the <br />subdivision). <br /> <br />The current annual assessment of $265.11 per parcel is no longer sufficient to fund the <br />Page 217 of 864