My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
071525 REGULAR
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 11:12:32 AM
Creation date
8/13/2025 11:08:09 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/15/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
694
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
page 4 of 21 42562.1 <br /> <br />C. Likewise, each Party agrees to provide related presentation materials for the public as well <br />as appointed and elected officials, to the other party for review and provide comment. Each Party <br />will use its best efforts to provide these presentation materials to the other Party so that it has at <br />least two (2) weeks to perform its review and provide feedback. The City will either incorporate <br />BART’s comments or meet with BART to resolve any significant differences with respect to <br />comments on presentation materials. <br /> <br />D. The Parties also agree to collaborate to identify potential funding sources to prepare the <br />Site for TOD. To the extent feasible, the Parties will lead and/or participate in the preparation of <br />grant applications for planning work and/or capital improvements. <br /> <br /> <br /> III. ACTIVITIES <br /> <br />Activities will generally be as identified in the Priority Sites Scope of Work, with additional <br />activities that may be added by mutual agreement. Key deliverables include, among others: <br />• Existing conditions and constraints memo <br />• Market analysis evaluating the potential for residential, commercial and institutional uses <br />• Station access and parking management study recommending the maximum level of BART <br />rider parking to be provided at the Site once TOD is completed, consistent with BART <br />policies which require considering cost and design tradeoffs <br />• Draft and final site reuse options (two to three) <br />• Draft goals and objectives <br />• Public outreach materials and participation in public meetings and hearings <br />• Development framework package including revised goals and objectives for <br />adoption/approval by the Parties <br /> <br /> <br />IV. PROJECT SCHEDULE <br /> <br />BART and the City will collaborate in preparing a project schedule as part of the initial activity <br />under this MOU. The project schedule will incorporate the periods of BART review of deliverables <br />and presentation materials referenced in Section II, above. It is anticipated that the activities <br />described in Section III, including a community engagement process, will be completed within 24 <br />months of the execution of this MOU. <br /> <br /> <br />VI. MODIFICATION <br /> <br />Any modification of this MOU will be effective only if it is executed in writing. <br /> <br /> <br />Signatures on following page <br /> <br />Page 102 of 694
The URL can be used to link to this page
Your browser does not support the video tag.