|
A-7
<br />Transportation Safety Action Plan
<br />CITY OF PLEASANTON
<br />PRANAV HAPPA, PE | CRASH COLLECTION AND ANALYSIS AND IDENTIFICATION OF AREAS OF CONCERN TASK LEAD
<br />Registration: TX 119973 (Civil) | TxDOT Pre-Certified, ESN 23644
<br />Education: M.S., Civil Engineering, University of Texas at Arlington, Texas | B.E., Civil Engineering, Gujarat University,
<br />Gujarat, India
<br />Mr. Happa has more than 19 years of transportation planning/engineering experience, and specializes in subarea and
<br />corridor planning, feasibility study, major investment grade study, traffic engineering study and traffic signal timing study.
<br />His technical skills include travel demand forecast modeling, travel demand surveys, GIS, transportation planning and
<br />analysis, micro-simulation analysis and highway capacity analysis. Mr. Happa specializes in Traffic and Revenue Study,
<br />travel demand modeling using TransCAD and Cube. He also specializes in traffic operations analysis using VISSIM, and Synchro/SimTraffic.
<br />Mr. Happa does not serve as Project Manager, majority of projects he leads tasks. We have provided three references for him as Task Lead.
<br />Concord Collision Analysis Dashboard and Vision Zero Action Plan, Concord
<br />Abhishek Parikh, City of Concord, (925) 671-3031, abhishek.parikh@cityofconcord.org
<br />Task Lead. Assisted with the development of the Collision Analysis Dashboard using over 10 years of collision data for various agencies. The
<br />Dashboard features an interactive mapping tool that supports collision analysis, data visualization, trend analysis, and high-injury network
<br />monitoring. Also developed their VZAP. The integration of the Collision Analysis Dashboard with Concord’s ArcGIS asset management platform
<br />has enhanced the city’s ability to monitor safety projects, identify future needs, and secure grant funding. This comprehensive approach supports
<br />Concord in implementing and evaluating safety measures, improving overall road safety, and advancing Vision Zero objectives.
<br />Local Roadway Safety Plan, Pico Rivera
<br />Kenner Guerrero, City of Pico Rivera, (562) 801-4351, kguerrero@pico-rivera.org
<br />Task Lead assisted in the preparation of the City of Pico Rivera's Local Roadway Safety Plan. Tasks included system review, stakeholder/public
<br />outreach, collision analysis, emphasis areas, countermeasure selection, safety projects, and final Local Roadway Safety Plan. TJKM prepared
<br />two HSIP Cycle 11 applications on behalf of the City that were awarded in March 2023.
<br />Vision Zero Plan, Livermore
<br />Joanna Liu, City of Livermore, (925) 960-4556, xliu@cityoflivermore.net
<br />Task Lead. Assisted the City to develop VZP to enhance safety and operations for all modes of transportation of all ages. The overarching goal
<br />is to provide for a safe and secure transportation system for all users while eliminating traffic fatalities from the transportation infrastructure within
<br />the city. The VZP includes assessment of existing policies, programs, and practices; formation of a Stakeholder Advisory Group; communicating
<br />data and information to the public on social media and on the city's website; providing project recommendations after collecting information from
<br />community engagement and stakeholder workgroups; collection of collision data and analysis, implementable and equitable solutions and
<br />performance measures; developing educational material for transportation system users of all ages; coordinating with the city to identify most
<br />at-risk population and working with local police and EMS departments; and creating a Final VZP to be presented to the Council for Adoption.
<br />Additional Projects
<br />•Waco MPO Comprehensive Safety Action Plan, Waco. Task Lead. Assisted the City of Waco and Waco MPO to prepare the CSAP.
<br />The CSAP will include planned projects that would provide a path to Vision Zero by proactively identifying and addressing potential safety
<br />hazards, enhancing the overall safety of the mobility space, and ultimately reducing fatalities, injuries, and crashes. By developing and
<br />prioritizing specific plans to enhance safety, CSAPs will contribute to the reduction and elimination of KSI crashes while increasing overall
<br />public awareness and increasing access to valuable future funding opportunities.
<br />•Vision Zero & Action Plan, Cupertino. Task Lead. Assisting City of Cupertino to develop a VZAP to enhance safety and operations for
<br />all modes of transportation of all ages. The overarching goal of a VZP is to provide for a safe and secure transportation system for all users
<br />while eliminating traffic fatalities from the transportation infrastructure within the city. The scope of work includes development of a Vision
<br />Zero policy, formation of SAG; public outreach; collision data collection and analysis; identification of Vision Zero countermeasures;
<br />development of policies and programs; development of a Capital Improvement List for the Action Plan and Action Plan Strategy;
<br />development of educational and enforcement programs; proposed text for a General Plan update; and a draft and final VZAP.
<br />•Vision Zero Action Plan, Dinuba. Task Lead assisting the City to develop a VZP to enhance safety and operations. The Vision Zero Plan
<br />includes assessment of existing policies, programs, and practices; formation of a Vision Zero Task Force; communicating data and
<br />information to the public on social media and on the City's website; conducting Bicycle Rodeos for students to practice and develop bicycle
<br />handling skills; providing project recommendations after collecting information from community engagement and stakeholder workgroups;
<br />collection of collision data and analysis, implementable actions and performance measures; developing educational material for
<br />transportation system users of all ages; coordinating with the city to identify most at-risk population and working with local police and EMS
<br />departments; and creating a Draft VZP to be presented to the Council for Adoption.
<br />Page 72 of 694
|