My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL WORKSHOP AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
071525 WORKSHOP
>
CITY COUNCIL WORKSHOP AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 11:49:09 AM
Creation date
8/13/2025 11:48:53 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/15/2025
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 <br />Public Works Department <br />The Public Works Department consists of 110 FTE <br />and 16 Part Time staff in multiple divisions, including: <br />Operations & Maintenance <br />•Parks: Parks, Trails, Medians. Open Spaces, Urban Forest <br />•Customer Service & Billing: Public Assistance, Utility Billing and <br />Service Requests <br />•Streets & Traffic Safety: Streets, Sidewalks, Traffic Signs, Roadway <br />Safety and Accessibility <br />•Fleet: Vehicle and Equipment Maintenance and Compliance <br />•Facilities: Building Maintenance and Improvements <br />18 <br />Public Works Department - continued <br />Utilities and Environmental Services <br />•Utilities: Water System, Storm Drain System, Sewer System <br />•Environmental Services: Water Efficiency Rebates, Water Conservation <br />Services, Storm Water Pollution Prevention Compliance, Backflow <br />Program, Fats, Oils, Grease Program <br />•Waste and Recycling: Promote Recycling and Composting, Regulatory <br />Compliance with Waste Programs <br />Engineering <br />•Capital Improvement Program (CIP): Project Planning, Infrastructure <br />Design, Public Facilities <br />•Land Development: Plan Review, Permitting, Regulatory Compliance <br />•Landscape Architecture: Park Design, Tree Preservation <br />•Construction Management: Project Oversight, Quality Control, <br />Contractor Coordination <br />Page 22 of 29
The URL can be used to link to this page
Your browser does not support the video tag.