Laserfiche WebLink
HCM Signalized Intersection Capacity Analysis Approved Plus Project AM <br />6: Sunol Blvd/First St & Bernal Ave <br />Synchro 11 Report <br />Page 6 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Volume (vph) 190 280 290 300 670 40 250 620 130 30 690 230 <br />Future Volume (vph) 190 280 290 300 670 40 250 620 130 30 690 230 <br />Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 <br />Total Lost time (s)4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 <br />Lane Util. Factor 0.97 0.95 1.00 0.97 0.95 0.97 1.00 1.00 1.00 0.95 <br />Frpb, ped/bikes 1.00 1.00 0.98 1.00 1.00 1.00 1.00 0.98 1.00 0.99 <br />Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Frt 1.00 1.00 0.85 1.00 0.99 1.00 1.00 0.85 1.00 0.96 <br />Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 <br />Satd. Flow (prot)3433 3539 1558 3433 3505 3433 1863 1559 1504 3134 <br />Flt Permitted 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 <br />Satd. Flow (perm)3433 3539 1558 3433 3505 3433 1863 1559 1504 3134 <br />Peak-hour factor, PHF 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 <br />Adj. Flow (vph) 213 315 326 337 753 45 281 697 146 34 775 258 <br />RTOR Reduction (vph) 0 0 154 04000730250 <br />Lane Group Flow (vph) 213 315 172 337 794 0 281 697 73 34 1008 0 <br />Confl. Peds. (#/hr)1427 <br />Confl. Bikes (#/hr) 2 3 1 <br />Parking (#/hr)10 10 10 <br />Turn Type Prot NA Perm Prot NA Prot NA Perm Prot NA <br />Protected Phases 7 4 3 8 5 2 1 6 <br />Permitted Phases 4 2 <br />Actuated Green, G (s) 12.2 18.7 18.7 24.5 31.0 11.0 54.2 54.2 4.8 48.0 <br />Effective Green, g (s) 12.2 19.6 19.6 24.5 31.9 11.0 55.1 55.1 4.8 48.9 <br />Actuated g/C Ratio 0.10 0.16 0.16 0.20 0.27 0.09 0.46 0.46 0.04 0.41 <br />Clearance Time (s)4.0 4.9 4.9 4.0 4.9 4.0 4.9 4.9 4.0 4.9 <br />Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 <br />Lane Grp Cap (vph) 349 578 254 700 931 314 855 715 60 1277 <br />v/s Ratio Prot 0.06 0.09 0.10 c0.23 c0.08 c0.37 0.02 0.32 <br />v/s Ratio Perm c0.11 0.05 <br />v/c Ratio 0.61 0.54 0.68 0.48 0.85 0.89 0.82 0.10 0.57 0.79 <br />Uniform Delay, d1 51.6 46.1 47.2 42.1 41.8 53.9 28.0 18.4 56.6 31.0 <br />Progression Factor 0.89 0.78 0.55 1.00 1.00 0.96 0.85 0.87 1.11 0.73 <br />Incremental Delay, d2 3.0 1.0 6.8 0.5 7.7 25.3 8.2 0.3 6.4 2.7 <br />Delay (s)49.2 37.2 32.9 42.7 49.5 77.1 31.9 16.3 69.3 25.3 <br />Level of Service DDCDD ECBEC <br />Approach Delay (s)38.5 47.5 41.2 26.7 <br />Approach LOS DDDC <br />Intersection Summary <br />HCM 2000 Control Delay 38.7 HCM 2000 Level of Service D <br />HCM 2000 Volume to Capacity ratio 0.85 <br />Actuated Cycle Length (s) 120.0 Sum of lost time (s)16.0 <br />Intersection Capacity Utilization 75.4% ICU Level of Service D <br />Analysis Period (min) 15 <br />c Critical Lane Group