My WebLink
|
Help
|
About
|
Sign Out
SUPPLEMENTAL MATERIALS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
021825 REGULAR
>
SUPPLEMENTAL MATERIALS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 12:05:26 PM
Creation date
8/13/2025 12:01:37 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/18/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HCM Signalized Intersection Capacity Analysis Approved Plus Project AM <br />13: Tassajara Rd & I-580 WB <br />Synchro 11 Report <br />Page 13 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Volume (vph)0 0 0 490 0 280 0 1280 480 0 1020 880 <br />Future Volume (vph)0 0 0 490 0 280 0 1280 480 0 1020 880 <br />Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 <br />Total Lost time (s)4.0 4.0 4.0 2.1 4.0 4.0 <br />Lane Util. Factor 0.97 0.88 0.95 1.00 0.91 1.00 <br />Frt 1.00 0.85 1.00 0.85 1.00 0.85 <br />Flt Protected 0.95 1.00 1.00 1.00 1.00 1.00 <br />Satd. Flow (prot)3433 2787 3539 1583 5085 1583 <br />Flt Permitted 0.95 1.00 1.00 1.00 1.00 1.00 <br />Satd. Flow (perm)3433 2787 3539 1583 5085 1583 <br />Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 <br />Adj. Flow (vph) 0 0 0 516 0 295 0 1347 505 0 1074 926 <br />RTOR Reduction (vph)000006400191000 <br />Lane Group Flow (vph) 0 0 0 516 0 231 0 1347 314 0 1074 926 <br />Turn Type Prot Perm NA Perm NA Free <br />Protected Phases 4 6 2 <br />Permitted Phases 4 4 6 Free <br />Actuated Green, G (s)7.6 7.6 21.1 21.1 21.1 40.0 <br />Effective Green, g (s)9.0 9.0 23.0 24.9 23.0 40.0 <br />Actuated g/C Ratio 0.22 0.22 0.58 0.62 0.58 1.00 <br />Clearance Time (s)5.4 5.4 5.9 5.9 5.9 <br />Vehicle Extension (s)5.0 5.0 5.0 5.0 5.0 <br />Lane Grp Cap (vph)772 627 2034 985 2923 1583 <br />v/s Ratio Prot 0.15 0.38 0.21 <br />v/s Ratio Perm 0.08 0.20 c0.58 <br />v/c Ratio 0.67 0.37 0.66 0.32 0.37 0.58 <br />Uniform Delay, d1 14.1 13.1 5.8 3.6 4.6 0.0 <br />Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 <br />Incremental Delay, d2 2.9 0.8 1.7 0.9 0.4 1.6 <br />Delay (s)17.1 13.9 7.5 4.4 4.9 1.6 <br />Level of Service B B A A A A <br />Approach Delay (s)0.0 15.9 6.7 3.4 <br />Approach LOS ABAA <br />Intersection Summary <br />HCM 2000 Control Delay 6.9 HCM 2000 Level of Service A <br />HCM 2000 Volume to Capacity ratio 0.73 <br />Actuated Cycle Length (s) 40.0 Sum of lost time (s)8.0 <br />Intersection Capacity Utilization 56.0% ICU Level of Service B <br />Analysis Period (min)15 <br />c Critical Lane Group
The URL can be used to link to this page
Your browser does not support the video tag.