Laserfiche WebLink
HCM Signalized Intersection Capacity Analysis Buildout No Project AM <br />10: El Charro Rd & Stoneridge Dr/Jack London Blvd <br />Synchro 11 Report <br />Page 9 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Volume (vph) 230 950 60 0 870 1410 30 160 10 1270 300 450 <br />Future Volume (vph) 230 950 60 0 870 1410 30 160 10 1270 300 450 <br />Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 <br />Total Lost time (s)4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 <br />Lane Util. Factor 0.94 0.95 1.00 0.95 0.88 1.00 0.86 0.94 0.91 1.00 <br />Frpb, ped/bikes 1.00 1.00 0.98 1.00 1.00 1.00 1.00 1.00 1.00 0.99 <br />Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Frt 1.00 1.00 0.85 1.00 0.85 1.00 0.99 1.00 1.00 0.85 <br />Flt Protected 0.95 1.00 1.00 1.00 1.00 0.95 1.00 0.95 1.00 1.00 <br />Satd. Flow (prot)4990 3539 1324 3539 2787 1770 3992 4990 3283 1563 <br />Flt Permitted 0.95 1.00 1.00 1.00 1.00 0.95 1.00 0.95 1.00 1.00 <br />Satd. Flow (perm)4990 3539 1324 3539 2787 1770 3992 4990 3283 1563 <br />Peak-hour factor, PHF 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 <br />Adj. Flow (vph) 235 969 61 0 888 1439 31 163 10 1296 306 459 <br />RTOR Reduction (vph) 0 0 27 0 0 255 090000 <br />Lane Group Flow (vph) 235 969 34 0 888 1184 31 164 0 1296 306 459 <br />Confl. Peds. (#/hr)5 1 2 <br />Confl. Bikes (#/hr)1 <br />Heavy Vehicles (%)2% 2% 20% 29% 2% 2% 2% 66% 2% 2% 58% 2% <br />Turn Type Prot NA Perm Prot NA pt+ov Prot NA Prot NA Free <br />Protected Phases 1 6 5 2 2 3 7 4 3 8 <br />Permitted Phases 6 Free <br />Actuated Green, G (s) 7.8 51.9 51.9 40.1 60.6 3.4 8.9 20.5 26.7 96.6 <br />Effective Green, g (s) 7.8 53.2 53.2 41.4 63.2 3.4 10.9 20.5 28.0 96.6 <br />Actuated g/C Ratio 0.08 0.55 0.55 0.43 0.65 0.04 0.11 0.21 0.29 1.00 <br />Clearance Time (s)4.0 5.3 5.3 5.3 4.0 6.0 4.0 5.3 <br />Vehicle Extension (s) 2.0 3.0 3.0 3.0 2.0 2.5 2.5 2.5 <br />Lane Grp Cap (vph) 402 1949 729 1516 1823 62 450 1058 951 1563 <br />v/s Ratio Prot 0.05 c0.27 0.25 c0.42 0.02 0.04 c0.26 0.09 <br />v/s Ratio Perm 0.03 c0.29 <br />v/c Ratio 0.58 0.50 0.05 0.59 0.65 0.50 0.36 1.22 0.32 0.29 <br />Uniform Delay, d1 42.8 13.4 10.0 21.1 10.0 45.8 39.6 38.0 26.9 0.0 <br />Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Incremental Delay, d2 1.4 0.2 0.0 0.6 0.8 2.3 0.4 109.8 0.1 0.5 <br />Delay (s)44.2 13.6 10.0 21.6 10.8 48.1 40.0 147.8 27.0 0.5 <br />Level of Service D B B C B D D F C A <br />Approach Delay (s)19.1 15.0 41.2 97.1 <br />Approach LOS B B D F <br />Intersection Summary <br />HCM 2000 Control Delay 45.7 HCM 2000 Level of Service D <br />HCM 2000 Volume to Capacity ratio 0.76 <br />Actuated Cycle Length (s) 96.6 Sum of lost time (s)16.0 <br />Intersection Capacity Utilization 80.9% ICU Level of Service D <br />Analysis Period (min) 15 <br />c Critical Lane Group