Laserfiche WebLink
HCM Signalized Intersection Capacity Analysis Buildout No Project AM <br />15: I-680 NB & Sunol Blvd <br />Synchro 11 Report <br />Page 14 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Volume (vph) 170 530 0 0 1350 470 40 0 560 0 0 0 <br />Future Volume (vph) 170 530 0 0 1350 470 40 0 560 0 0 0 <br />Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 <br />Total Lost time (s)4.0 4.0 4.0 4.0 4.0 2.7 <br />Lane Util. Factor 1.00 1.00 0.91 1.00 1.00 0.88 <br />Frt 1.00 1.00 1.00 0.85 1.00 0.85 <br />Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00 <br />Satd. Flow (prot)1770 1845 5085 1583 1543 2787 <br />Flt Permitted 0.95 1.00 1.00 1.00 0.95 1.00 <br />Satd. Flow (perm)1770 1845 5085 1583 1543 2787 <br />Peak-hour factor, PHF 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 <br />Adj. Flow (vph) 181 564 0 0 1436 500 43 0 596 0 0 0 <br />RTOR Reduction (vph)00000247000000 <br />Lane Group Flow (vph) 181 564 0 0 1436 253 0 43 596 0 0 0 <br />Heavy Vehicles (%)2% 3% 2% 2% 2% 2% 17% 2% 2% 2% 2% 2% <br />Turn Type Prot NA NA Perm Split NA Free <br />Protected Phases 1 6 2 4 4 <br />Permitted Phases 2 Free <br />Actuated Green, G (s) 6.9 32.4 21.5 21.5 2.0 45.0 <br />Effective Green, g (s) 6.9 33.7 22.8 22.8 3.3 45.0 <br />Actuated g/C Ratio 0.15 0.75 0.51 0.51 0.07 1.00 <br />Clearance Time (s)4.0 5.3 5.3 5.3 5.3 <br />Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 <br />Lane Grp Cap (vph) 271 1381 2576 802 113 2787 <br />v/s Ratio Prot c0.10 0.31 c0.28 0.03 <br />v/s Ratio Perm 0.16 c0.21 <br />v/c Ratio 0.67 0.41 0.56 0.32 0.38 0.21 <br />Uniform Delay, d1 18.0 2.0 7.6 6.5 19.9 0.0 <br />Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 <br />Incremental Delay, d2 6.1 0.2 0.9 1.0 2.1 0.2 <br />Delay (s)24.1 2.2 8.5 7.6 22.0 0.2 <br />Level of Service C A A A C A <br />Approach Delay (s)7.5 8.3 1.6 0.0 <br />Approach LOS AAAA <br />Intersection Summary <br />HCM 2000 Control Delay 6.8 HCM 2000 Level of Service A <br />HCM 2000 Volume to Capacity ratio 0.57 <br />Actuated Cycle Length (s) 45.0 Sum of lost time (s)12.0 <br />Intersection Capacity Utilization 52.7% ICU Level of Service A <br />Analysis Period (min) 15 <br />c Critical Lane Group