My WebLink
|
Help
|
About
|
Sign Out
SUPPLEMENTAL MATERIALS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
021825 REGULAR
>
SUPPLEMENTAL MATERIALS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 12:05:26 PM
Creation date
8/13/2025 12:01:37 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/18/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HCM Signalized Intersection Capacity Analysis Buildout Plus Project PM <br />16: Sunol Blvd & I-680 SB <br />Synchro 11 Report <br />Page 16 <br />Movement EBL EBT WBT WBR SBL SBR <br />Lane Configurations <br />Traffic Volume (vph)40 840 230 700 310 160 <br />Future Volume (vph)40 840 230 700 310 160 <br />Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 <br />Total Lost time (s)4.0 4.0 4.0 4.0 4.0 4.0 <br />Lane Util. Factor 1.00 1.00 1.00 0.88 1.00 1.00 <br />Frt 1.00 1.00 1.00 0.85 1.00 0.85 <br />Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00 <br />Satd. Flow (prot)1770 1863 1863 2787 1770 1583 <br />Flt Permitted 0.95 1.00 1.00 1.00 0.95 1.00 <br />Satd. Flow (perm)1770 1863 1863 2787 1770 1583 <br />Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 <br />Adj. Flow (vph) 42 884 242 737 326 168 <br />RTOR Reduction (vph) 0 0 0 367 0 126 <br />Lane Group Flow (vph) 42 884 242 370 326 42 <br />Turn Type Prot NA NA Perm Prot Perm <br />Protected Phases 1 6 2 4 <br />Permitted Phases 2 4 <br />Actuated Green, G (s) 2.8 35.6 28.8 28.8 13.8 13.8 <br />Effective Green, g (s) 2.8 36.9 30.1 30.1 15.1 15.1 <br />Actuated g/C Ratio 0.05 0.61 0.50 0.50 0.25 0.25 <br />Clearance Time (s)4.0 5.3 5.3 5.3 5.3 5.3 <br />Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 <br />Lane Grp Cap (vph)82 1145 934 1398 445 398 <br />v/s Ratio Prot 0.02 c0.47 0.13 c0.18 <br />v/s Ratio Perm 0.13 0.03 <br />v/c Ratio 0.51 0.77 0.26 0.26 0.73 0.11 <br />Uniform Delay, d1 27.9 8.5 8.6 8.6 20.6 17.3 <br />Progression Factor 1.10 1.04 0.56 3.24 1.00 1.00 <br />Incremental Delay, d2 5.2 4.9 0.1 0.1 6.1 0.1 <br />Delay (s) 35.8 13.8 5.0 27.9 26.7 17.4 <br />Level of Service D B A C C B <br />Approach Delay (s)14.8 22.3 23.6 <br />Approach LOS B C C <br />Intersection Summary <br />HCM 2000 Control Delay 19.6 HCM 2000 Level of Service B <br />HCM 2000 Volume to Capacity ratio 0.82 <br />Actuated Cycle Length (s) 60.0 Sum of lost time (s)12.0 <br />Intersection Capacity Utilization 68.1% ICU Level of Service C <br />Analysis Period (min)15 <br />c Critical Lane Group
The URL can be used to link to this page
Your browser does not support the video tag.