Laserfiche WebLink
Aubrey Rose <br />November 8, 2024 <br />Page 2 <br /> <br /> <br />lakes will be interconnected by a series of conduits and used by Zone 7 for local water <br />management functions, thereby enhancing the resiliency and flexibility of Zone 7’s water supply <br />functions. Zone 7 currently owns Lake I and Cope Lake and expects Lake H to be transferred to <br />Zone 7 within the next few years. <br />Maintaining the integrity of the quarry lakes and the quality of the underlying groundwater basin <br />is of utmost priority to Zone 7’s water management mission. Current ly, groundwater recharge <br />occurs through infiltration of both rainfall and releases of imported water made to Arroyo Mocho <br />and Arroyo del Valle. As surface water in these channels reaches the central part of the <br />Livermore-Amador Valley (including the mining areas), it infiltrates into the main groundwater <br />basin and boosts local groundwater supply. These influxes of recharge support salt management <br />in the basin, complementing the agency’s on-going efforts to put both surface water and <br />groundwater to maximum beneficial uses within the County. As further lakes are added to the <br />chain, COL will provide additional capacity and flexibility for flood control and groundwater <br />recharge, including more ability for managing water quality. Lake I, in particular, will pla y a <br />critical role in enhanced groundwater recharge due to its size, location, and recharge face on the <br />western sidewall. <br />Currently Zone 7 is evaluating a Chain of Lakes Conveyance Project to include a multi -use <br />pipeline that will connect the northern COLs area (e.g., Lake I) with Lake A and the South Bay <br />Aqueduct and with Zone 7’s water treatment plant. The concept of the pipeline is to convey <br />excess surface water supply—including imported water and local water from the Arroyo Valle— <br />to the COLs for storage and groundwater recharge. The pipeline will also supply raw water from <br />the COLs to Zone 7’s Del Valle Water Treatment Plant (WTP) for use under emergency and <br />drought situations. A pipeline alignment study has been completed and Zone 7 is further <br />evaluating operational schemes and pertinent details. However, the proposed Project may <br />jeopardize this crucial infrastructure project if sewage or effluent are allowed to directly or <br />indirectly enter the lakes through runoff or infiltration. <br />Groundwater Quality Standards and Groundwater Management in the Livermore <br />Valley Groundwater Basin <br />Zone 7 relies on imported water for approximately 70% of its drinking water supply, and so the <br />groundwater basin is an important backstop to providing water supply in times of drought, or in <br />the event that any portion of the state’s water infrastructure should fail (for example, in the event <br />of natural disaster). Zone 7 strives to maintain the groundwater basin at full capacity whenever <br />possible to ensure that this locally stored water supply is available to meet the needs of County <br />residents. <br />As the exclusive Groundwater Sustainability Agency (GSA) for the Livermore Valley <br />Groundwater Basin, Zone 7 prepared and implements a groundwater sustainability plan (GSP) <br />for the Basin pursuant to the Sustainable Groundwater Management Act (SGMA). Through the <br />GSP, Zone 7 has identified thresholds within which the Basin can be operated without resulting <br />in an impermissible “undesirable result” under SGMA. <br /> Significant and unreasonable degradation of water quality is an undesirable result under State <br />law, and Zone 7 is tasked with managing the basin to avoid such an outcome. Consistent with