Laserfiche WebLink
<br />100 Pringle Avenue | Suite 600 | Walnut Creek, CA 94596 | (925) 930-7100 | Fax (925) 933-7090 www.fehrandpeers.com <br />Final Memorandum <br />Date: February 12, 2025 <br />To: Mike Tassano, City of Pleasanton <br />From: Bill Burton and Bruno Lertora, Fehr & Peers <br />Subject: El Charro Road Extension Assessment <br />WC22-3932 <br />Executive Summary <br />This memorandum summarizes the results of the transportation assessment prepared for the El <br />Charro Road extension project. The El Charro Road extension project would connect Stoneridge <br />Drive and Stanley Boulevard with a four-lane divided roadway. The project would also extend <br />Busch Road east to this new roadway, collectively providing a new north-south alternative <br />through the City of Pleasanton. Fehr & Peers conducted a travel patterns assessment of the <br />proposed extension by utilizing multiple data sources including existing counts, StreetLight data, <br />and local and regional travel demand models to analyze the impacts of the extension. <br />The results of this assessment indicate the transportation effects of the proposed El Charro Road <br />extension in terms of traffic volume (diversion), intersection level of service (LOS) at key locations, <br />and travel times on key links are generally positive, as the extension benefits other competing <br />north-south roadways, such as Santa Rita Road, by re-routing traffic from them. <br />Some roadways, such as Bernal Avenue and Stanley Boulevard, may experience increased traffic <br />with the proposed extension. The El Charro Road extension would lead to an increase in average <br />delay at the intersection of El Charro Road/Stoneridge Drive, but traffic operations at this <br />intersection would remain at an acceptable level of service. Part of this impact can be explained <br />by cut-through traffic from I-680 and I-580 as well as induced regional demand using the new <br />roadway extension. Approximately 150 to 200 vehicles would be regional cut-through traffic <br />without a local origin or destination in the peak direction on the extension. This amount of cut- <br />through traffic is smaller than the current cut-through traffic using Santa Rita Road during the AM <br />and PM peak hours, which is estimated at 200 to 350 vehicles in the corresponding <br />peak direction. Approximately 50% of the cut-through traffic on El Charro Road would come from <br />existing cut-through traffic on Santa Rita Road.