Laserfiche WebLink
Mike Tassano January 31, 2025 <br />Page 17 of 37 <br />Intersection Control1 Peak Hour <br />Approved No Extension Approved Plus Extension <br />Delay LOS Delay LOS <br />15 Sunol Boulevard/ I-680 northbound ramps Signal AM PM <br />6 A 5 A <br />9 A 8 A <br />16 Sunol Boulevard/ I-680 southbound ramps Signal AM PM <br />22 C 22 C <br />13 B 13 B <br />Notes: <br />1. Intersection traffic control type (Signal = Signalized) 2. LOS E and F are shown in bold Source: Fehr & Peers, January 2025. <br />Travel Time Assessment – Key Links/Routes <br />The intersection operations analysis presented above was also used to estimate travel times along <br />several routes that may be affected by the extension. Figure 7 presents the key routes. Table 4 <br />presents the routes that were evaluated for this analysis in the northbound and southbound <br />directions during the weekday morning and evening peak periods. The travel times compare with <br />and without extension scenarios. These results suggest the extension has a positive impact on <br />reducing travel times along Main Street and Santa Rita Road, especially during the AM peak hour. <br />First Street is another roadway where travel times are reduced by the proposed extension, while <br />travel times along Bernal Avenue in the northbound direction, given its traffic volume increase, <br />are greater with the extension. There does not appear to be a substantial impact on travel times <br />along Isabel Avenue. <br /> <br />