My WebLink
|
Help
|
About
|
Sign Out
EAST BAY REGIONAL PARK DISTRICT - LEMOINE BYPASS PIPELINE
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
E
>
EAST BAY REGIONAL PARK DISTRICT - LEMOINE BYPASS PIPELINE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2025 3:57:43 PM
Creation date
8/28/2025 3:49:54 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
7/15/2025
LONG TERM AGREEMENTS - NAME
EAST BAY REGIONAL PARK DISTRICT - LEMOINE BYPASS
LONG TERM AGREEMENTS - TYPE
EASEMENT AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
LEMOINE BYPASS PIPEL
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTE: If your activity/project is already permitted, <br />please follow the conditions in your permit. <br />General Resource Protection ...................................1 <br />Vegetation Removal ......................................................2 <br />Tree Cutting/Removal ..................................................2 <br />Vehicle Access ................................................................3 <br />Weed and Pathogen Prevention ................................3 <br />Work Near Streams, <br />Wetlands and Waterbodies ....................................4 <br />Reporting Wildlife/Cattle Incidents ..........................4 <br />Cultural Resources........................................................5 <br />Stewardship developed this document to serve as a <br />resource to help you minimize your ecological footprint <br />while maintaining your parks. The information it contains <br />reach out to Stewardship@ebparks.org or browse <br />the resources at ebparks.sharepoint.com/sites/ <br />StewResources! <br />• Know your park! Check ParkView-Vegetation layer-Special <br />Status Species or contact Stewardship@ebparks.org for <br />a map of rare plants in the area you plan to work. <br />• Prior to general mowing or grading, walk the site; this <br />mowing or grading area. This also provides an opportunity <br />to look for rocks, sprinkler heads, and debris. <br />• During work activities, all trash that may attract wildlife <br />should be properly contained, removed from the work site, <br />and disposed of regularly. Following completion of work, <br />remove all trash <br />and construction <br />debris from work <br />areas. <br />• Do not allow <br />rinse or wash <br />water (concrete <br />rinse, paint wash, <br />car wash, etc.) <br />to be directed <br />or dumped into <br />any drain inlet or <br />surface water; properly dispose of all rinse and/or wash <br />water. <br />• DO NOT PUMP water from lagoons, lakes, ponds or <br />other water bodies without proper authorization and <br />discharge plan. <br />• Following soil excavation, match the pre-existing contours <br />to ensure that drainage patterns remain the same. <br />Minimize compaction of topsoil to the extent possible. <br />• Debris from lop and scatter slash treatments should be left <br />at a height no greater than 18 inches. Avoid chipping into <br />grasslands. Woody material should be in contact with soil <br />for faster breakdown. <br />• Avoid placing or spreading soil, sand or sediment on top of <br />existing burrows or grasslands. Place debris in developed <br />areas. <br />• Cover all excavated holes or trenches deeper than <br />12 inches at the end of each workday to prevent animals <br />becoming entrapped. Alternatively, exit ramps may be <br />placed in holes, trenches, or troughs to allow animals <br />to escape. <br />• Limit construction activities to daylight hours. <br /> If you are planning a project in shorelines, wetlands, ponds, <br />lakes, streams, riparian areas or in undeveloped land that <br />includes grading, trail construction or realignment, or new <br />infrastructure, consult Stewardship to ensure regulatory <br />compliance and possible seasonal work restrictions are <br />followed. Email Stewardship@ebparks.org. <br />1 <br />Docusign Envelope ID: FC1F18B4-4491-45B3-9922-58279C679BDA
The URL can be used to link to this page
Your browser does not support the video tag.