My WebLink
|
Help
|
About
|
Sign Out
WEST YOST ASSOCIATES (#2026112)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
W
>
WEST YOST ASSOCIATES (#2026112)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2025 4:01:51 PM
Creation date
8/28/2025 3:59:01 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Professional Services
Contract Type
New
NAME
WEST YOST ASSOCIATES
Contract Record Series
704-05
Munis Contract #
2026112
Contract Expiration
12/31/2026
NOTES
CONSULTING SERVICES FOR COMPLIANCE WITH AMERICA'S WATER INFRASTRUCTURE ACT 2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Effective January 1, 2025, through December 31, 2025)* <br />POSITIONS <br />ENGINEERING <br />Principal/Vice President $373 <br />Engineer/Scientist/Geologist Manager I / II $352 /$369 <br />Principal Engineer/Scientist/Geologist I / II $317 /$338 <br />Senior Engineer/Scientist/Geologist I / II $286 /$300 <br />Associate Engineer/Scientist/Geologist I / II $237 /$255 <br />Engineer/Scientist/Geologist I / II / III $185 /$215 /$224 <br />Engineering Aide $111 <br />Field Monitoring Services $138 <br />Administrative I / II / III / IV $102 /$127 /$152 /$168 <br />ENGINEERING TECHNOLOGY <br />Engineering Tech Manager I / II $366 /$369 <br />Principal Tech Specialist I / II $336 /$348 <br />Senior Tech Specialist I / II $308 /$321 <br />Senior GIS Analyst $278 <br />GIS Analyst $264 <br />Technical Specialist I / II / III / IV $196 /$224 /$251 /$280 <br />Technical Analyst I / II $141 /$168 <br />Technical Analyst Intern $113 <br />Cross-Connection Control Specialist I / II / III / IV $147 /$159 /$179 /$198 <br />CAD Manager $222 <br />CAD Designer I / II $172 /$194 <br />CONSTRUCTION MANAGEMENT <br />Senior Construction Manager $355 <br />Construction Manager I / II / III / IV $211 /$226 /$239 /$303 <br />Resident Inspector (Prevailing Wage Groups 4 / 3 / 2 / 1)$190 /$211 /$235 /$244 <br />Apprentice Inspector $172 <br />CM Administrative I / II $91 /$124 <br />Field Services $244 <br />2025 Billing Rate Schedule <br />LABOR CHARGES (DOLLARS PER HOUR) <br />■ Hourly rates include charges for technology and communication, such as general and CAD computer software, <br /> telephone calls, routine in-house copies/prints, postage, miscellaneous supplies, and other incidental project expenses. <br />■ Outside services, such as vendor reproductions, prints, and shipping; major West Yost reproduction efforts; as well as <br /> engineering supplies, etc., will be billed at the actual cost plus 15%. <br />■ The Federal Mileage Rate will be used for mileage charges and will be based on the Federal Mileage Rate applicable to <br /> when the mileage costs were incurred. Travel other than mileage will be billed at cost. <br />■ Subconsultants will be billed at actual cost plus 10%. <br />■ Expert witness services, research, technical review, analysis, preparation, and meetings will be billed at 150% of standard hourly <br /> rates. Expert witness testimony and depositions will be billed at 200% of standard hourly rates. <br />■ A finance charge of 1.5% per month (an annual rate of 18%) on the unpaid balance will be added to invoice amounts <br /> if not paid within 45 days from the date of the invoice. <br />* This schedule is updated annually Page 1 of 2 <br />EXHIBIT A <br />Docusign Envelope ID: 0F3360EC-0957-4BAE-961E-506A072901B6
The URL can be used to link to this page
Your browser does not support the video tag.