Laserfiche WebLink
66 Franklin St Ste 300, 209-207-3917 Tel MURGREEN <br />Oakland, CA 94607 209-340-0158 Fax City of Pleasanton, CA <br /> <br />7 | P a g e <br /> <br />Pacific Gas & Electric (PG&E), <br />California <br />Murgreen provides Cross bore <br />inspection services to PG&E, as we are <br />Gold Shovel and ISN certified <br />professionals. The scope of service <br />includes CCTV inspections of Sewer <br />mains, Storm Drains and Lateral <br />Launching/Push Camera inspections <br />of sewer laterals, Sewer Clean-outs <br />installations, Hydro jetting and <br />vacuuming. <br />Murgreen conducted sewer cleaning <br />and CCTV inspection to help evaluate <br />and locate the sewers for Crossbore and <br />preparation of the new Gas lines <br />installation. Over the past 3 years at the <br />PG&E Crossbore prevention program, <br />we have inspected more than 40,000 <br />sewer mains and storm drain mainline inspections and located more than 10,000 laterals <br />through launching and push rod inspections and have performed more than 5000 roof <br />vent inspections to locate lateral lines. Under this cope Murgreen also was tasked with <br />installing more than 500 foundation and property line clean-out to locate laterals. A total <br />of 1 Gas bore and 5 Non-Gas bore has been found through Murgreen field inspection <br />process. Murgreen utilized NASCCO certified GraniteXP, Wincan and POSM software <br />are used in the collection of video data documenting the sewers. Murgreen also leverages <br />an in-house Cross bore developed GIS app for collecting and mapping inspection data in <br />the field. The web GIS mapping application can be accessed here <br />https://www.arcgis.com/apps/mapviewer/index.html?webmap=caf41dddfe534bb783e5a05403b98024 <br />The app is a GIS enabled application, with unlimited access to view Cross bore inspection <br />data and near real time access to video inspections and reports through mobile devices. <br />Our office mapping staff QA/QC Crossbore inspection videos and produced maps and <br />reports on a near real time basis. <br />Reference: Mrs. Dayna Heberlein, PG&E Cross bore Prevention Construction Supervisor– <br />6121 Bollinger Canyon Rd, San Ramon, CA 94583 – Telephone: 925/719-4296 <br />Project value $4M, Contract Term: in progress <br /> <br /> <br /> <br /> <br />Docusign Envelope ID: 2506206F-E345-4DD4-95FA-F9789F713AEF