My WebLink
|
Help
|
About
|
Sign Out
MURGEEN ENVIRONMENTAL COMPANY
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
M
>
MURGEEN ENVIRONMENTAL COMPANY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2025 4:54:15 PM
Creation date
8/28/2025 4:51:09 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
As-Needed Agreement for Maintenance or Trade
Contract Type
New
NAME
MURGEEN ENVIRONMENTAL COMPANY
Contract Record Series
704-05
Munis Contract #
2026052
Contract Expiration
6/30/2028
NOTES
UTLILITES - SEWER & STORM JETTING & CCTB SERVICES RFP #PWD 25.602
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
66 Franklin St Ste 300, 209-207-3917 Tel MURGREEN <br />Oakland, CA 94607 209-340-0158 Fax City of Pleasanton, CA <br /> <br />12 | P a g e <br /> <br />staff will attempt to launch the lateral lines from the sewer mainlines first, and if it <br />is not possible to launch, we will attempt lateral inspection from the property line <br />clean-out or the foundation clean-out or roof vent access clean-out using a Vivax <br />push road camera. If all attempt fails from clean-out access point, Murgreen will <br />communicate with the city by either recommending a Clean-out install to <br />complete the inspection work. <br />6. Smoke Testing mainlines: Murgreen trained smoke testing staff will deploy <br />Pipeline Smoke tester equipment manufactured by Hurco Technologies to the <br />Town. Prior to commencing this work, Murgreen will work with the city to design <br />a smoke testing outreach program to the Citizens of the areas to be smoked tested <br />and the duration of the project. We would collect system maps, provide traffic <br />adjustments, deliver notifications, conduct smoke tests, organize smoke test data <br />leveraging our ESRI survey 123 application to capture and geocode smoke test <br />locations and results. <br />7. Field Data Collection Workflow: All Murgreen Field technicians are verse and <br />properly trained with utilizing ESRI Field maps, workforce, Survey 123 for <br />creating and tracking workorder for this sewer inspection scope of work. As <br />indicated, Murgreen will provide access to a Command Center Dashboard to the <br />City to access real time inspection data collected in the field. <br />8. CCTV Data QA/QC: Murgreen database analyst will be responsible for <br />consolidating/merging all inspections into one Granite/POSM database for <br />exporting purpose to PACP access database and also will review data collected to <br />make sure they align with Town’s expectations. All video and pictures collected <br />during this survey will be hyperlink to our ESRI web GIS map and shall be made <br />accessible to the city, within 24hrs after the field inspection is completed. All <br />survey will be imported into Pioneer AI software <br />9. QA/QC Map & Log: Murgreen QA/QC analysis team will review and analyze the <br />completed inspected data from pre-inspection or post-inspection that were logged <br />on ArcGIS by the field team. This analysis consists of detailed review of each data <br />point inspected on the app and the team translates those data into a Map and Log <br />template that is pre-reviewed by the team before submission. <br />10. Manhole Inspections: Murgreen will perform a level 2 MACP inspections of no of <br />sewer manholes identified in the RFP. The inspections will be done utilizing a <br />high-resolution portable camera system with the Level 2 MACP data architecture <br />in our ESRI GIS field map collector. The manholes will be rated a score of 1-5 to <br />determine the condition score. <br /> <br />Cleaning Plan: <br />• Cleaning will be performed between the hours of 7AM-5PM Monday through <br />Friday and in accordance with the project schedule as provided. <br />• Cleaning will be done by Hydro-flushing, with debris removed through vacuum <br />tube. Equipment will be set up in accordance with Murgreen Cleaning Standard <br />Operating Procedures (SOPs). Traffic control will be in accordance with Caltrans <br />and DOT requirements, all Murgreen employees will be trained and certified in <br />these procedures. <br />Docusign Envelope ID: 2506206F-E345-4DD4-95FA-F9789F713AEF
The URL can be used to link to this page
Your browser does not support the video tag.