My WebLink
|
Help
|
About
|
Sign Out
MURGEEN ENVIRONMENTAL COMPANY
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
M
>
MURGEEN ENVIRONMENTAL COMPANY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2025 4:54:15 PM
Creation date
8/28/2025 4:51:09 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
As-Needed Agreement for Maintenance or Trade
Contract Type
New
NAME
MURGEEN ENVIRONMENTAL COMPANY
Contract Record Series
704-05
Munis Contract #
2026052
Contract Expiration
6/30/2028
NOTES
UTLILITES - SEWER & STORM JETTING & CCTB SERVICES RFP #PWD 25.602
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
66 Franklin St Ste 300, 209-207-3917 Tel MURGREEN <br />Oakland, CA 94607 209-340-0158 Fax City of Pleasanton, CA <br /> <br />14 | P a g e <br /> <br />• Cleaning Nozzle- 3D Applications (Used for sand, mud, silt, crust and <br />grease applications) <br />• Dredger Nozzles- 3D Applications (used for removal of heavy solids, silts <br />sand and sludge) <br />• Radial Cleaning Nozzle- 3D Applications (used for encrusted grease, scale, <br />sand and silt) <br />• Turbo III Flexible Chain Cutter Applications (Used for removing ex tensive <br />root growth and total blockages, as well as for removing obstructions such <br />as calcium, grease, scale and crust) <br />• CUES granite XP/Net and POSM software will be used to code defect to <br />comply with NASSCO PACP standard. <br />• Portable bypass pumps (Quantity of pumps is 2) <br /> <br /> <br /> <br />Project Schedule <br />Murgreen understands the city’s urgency for this project, as well as the need to ensure <br />that no by-pass pumping and/or disruptions of sewage flow will occur during the <br />cleaning and inspection process. Table 2, below provides our proposed schedule for this <br />project, with the start date defined as tentative. As an alternative to this baseline schedule, <br />we are prepared to offer an accelerated approach that could be established in <br />collaboration with the city to meet more specific schedule deadlines. The schedule <br />presented on Table 2 identifies the core task that will be a part of this project in response <br />to the requirements as identified in the RFP. <br />Table 2./Murgreen – Proposed Schedule <br />No. Task Name Duration Start Finish <br />1. Notice to Proceed Tentative Tentative Tentative <br />2. Coordinate field work with <br />Client Tentative Tentative Tentative <br />3. Mobilization-Demobilization Tentative Tentative Tentative <br />4. <br />Clean sewer lines, utilizing <br />best management practice <br />approach. <br />Tentative Tentative Tentative <br />Docusign Envelope ID: 2506206F-E345-4DD4-95FA-F9789F713AEF
The URL can be used to link to this page
Your browser does not support the video tag.