My WebLink
|
Help
|
About
|
Sign Out
LARRY WALKER ASSOCIATES, INC.
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
W
>
LARRY WALKER ASSOCIATES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2025 2:49:08 PM
Creation date
9/3/2025 2:42:35 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Professional Services
Contract Type
New
NAME
LARRY WALKER ASSOCIATES, INC.
Contract Record Series
704-05
Munis Contract #
2026131
Contract Expiration
12/31/2026
NOTES
SEWER PIPE BLOCKAGE CONTROL PROGRAM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RATE SHEET FOR LARRY WALKER ASSOCIATES, INC. <br />City of Pleasanton <br />Proposal for Sewer Pipe Blockage Control Program Services <br />May 2025 <br />Task Unit Cost ($) <br />Task 1 - Final Sewer Pipe Blockage Control <br />Program <br />8 hrs Project Scientist <br />6 hrs Sr Engineer <br />$ 3,700 <br />Task 2.1 - Routine SPBCP FSE Inspections <br />(cost/inspection with initial list of 53 FSE) <br />2 hrs per inspection (including prep time, <br />inspection report, travel time, LWA team <br />coordination and progress updates to City), <br />plus mileage cost (direct cost for 8 inspection <br />days, est. $50 per day). <br />53 inspections by Project Scientist, <br />accompanied by Sr Engineer at 2 inspections <br />$19,700 <br />Task 2.2 - Follow-Up Compliance <br />Inspections <br />2 hrs per inspection (including draft Notice to <br />Correct, inspection report, travel time, LWA <br />team coordination and progress updates to <br />City), plus mileage cost (direct cost for 4 <br />inspection days, est. $50 per day). <br />25 inspections by Project Scientist, <br />accompanied by Sr Engineer at 2 inspections <br />$10,100 <br />Total (Task 1 and 2) $33,500 <br />Task 3: As -Needed Services <br />Task 3.1 - As-Needed SPBCP Routine FSE <br />Inspections <br />2 hrs per inspection (including prep time, <br />inspection report, travel time, LWA team <br />coordination and progress updates to City), <br />plus mileage cost (est. $50 per day). <br />To be conducted by Project Scientist. <br />$400 per <br />inspection <br />Task 3.2 - As-Needed SPBCP Inspections <br />Limited FSE <br />1.75 hrs per inspection (including prep time, <br />inspection report, travel time, LWA team <br />coordination and progress updates to City), <br />plus mileage cost (est. $50 per day). <br />To be conducted by Project Scientist. <br />$350 per <br />inspection <br />Task 3.3 - As-Needed Follow-Up <br />Compliance Inspections <br />2 hrs per inspection (including draft Notice to <br />Correct, inspection report, travel time, LWA <br />team coordination and progress updates to <br />City), plus mileage cost (direct cost for 4 <br />inspection days, est. $50 per day). <br />To be conducted by Project Scientist. <br />$400 per <br />inspection <br />Misc. Assistance (for unforeseen services <br />requested) <br />Hourly TBD <br />EXHIBIT A <br />Docusign Envelope ID: 183BA217-2E64-4627-AB5B-FA1828041D5A
The URL can be used to link to this page
Your browser does not support the video tag.