My WebLink
|
Help
|
About
|
Sign Out
FRONTIER BUILDING PRODUCTS PACIFIC, INC. (#2026169)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
F
>
FRONTIER BUILDING PRODUCTS PACIFIC, INC. (#2026169)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2025 4:42:58 PM
Creation date
9/8/2025 4:40:42 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
As-Needed Agreement for Maintenance or Trade
Contract Type
New
NAME
FRONTIER BUILDING PRODUCTS PACIFIC, INC.
Contract Record Series
704-05
Munis Contract #
2026169
Contract Expiration
12/31/2025
NOTES
REPLACEMENT OF (4) CORNELL COOKSON MODEL EX3728L ROLL-UP DOORS AT FIRE STATION #4.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Please provide a quote for the purchase and delivery only of four (4) Cornell Iron <br />Extreme Series™ EX3700L sectional doors that meet the following specifications: <br />https://www.cornelliron.com/ <br />Max dimensions: 16’2” W x 14’0” H <br />Opening speed: 24”/second <br />Insulated Intellicore® polyurethane (R-value up to 18.4) <br />Up to 600 cycles per day <br />Safety features: light curtain, cable tension monitoring, wireless bottom edge <br />Connectivity: myQ® Facility integration <br />Finish: stucco or woodgrain embossed, window options optional <br />Please include in your quote: <br />Line-item pricing for doors, hardware, and delivery <br />Delivery timeline and terms <br />Warranty and support documentation <br />Proof of manufacturer/distributor status for Cornell Iron <br />Part 2 – Turnkey: Purchase, Removal & Installation <br />Please provide a quote for a complete service, including: <br />Safe removal/disposal of the current door system <br />Delivery and installation of four (4) Cornell EX3700L sectional doors <br />Framing modifications (if needed) <br />Operator integration with Wi-Fi control <br />Safety and performance testing <br />On-site training for City staff <br />Project Timeline: <br />Quote Deadline: August 4, 2025 <br />Anticipated Start: August 18, 2025 <br />Completion Required: October 3, 2025 <br />Please include in your quote: <br />Cost breakdown (labor, materials, taxes, equipment, etc.) <br />Proof of DIR registration <br />Confirmation of prevailing wage compliance <br />Availability and timeline <br />Subcontractor list (if applicable) with DIR numbers <br />Product data and warranty details <br />For additional details, product reference, or site walkthroughs, please contact: <br />Steve Castaneda <br />Docusign Envelope ID: AA9A7CC3-A9B9-47D8-A802-F89481667D21
The URL can be used to link to this page
Your browser does not support the video tag.