My WebLink
|
Help
|
About
|
Sign Out
RES 2025037-1
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2025
>
RES 2025037-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2025 11:25:33 AM
Creation date
10/3/2025 11:23:30 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/15/2025
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RESO 2025-037-1
Document Relationships
BAY AREA RAPID TRANSIT (BART) MOU 25-0725
(Message)
Path:
\CITY CLERK\CONTRACTS\B
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Likewise,each Party agrees to provide related presentation materials for the public as well <br /> as appointed and elected officials, to the other party for review and provide comment. Each Party <br /> will use its best efforts to provide these presentation materials to the other Party so that it has at <br /> least two (2) weeks to perform its review and provide feedback. The City will either incorporate <br /> BART's comments or meet with BART to resolve any significant differences with respect to <br /> comments on presentation materials. <br /> D. The Parties also agree to collaborate to identify potential funding sources to prepare the <br /> Site for TOD. To the extent feasible, the Parties will lead and/or participate in the preparation of <br /> grant applications for planning work and/or capital improvements. <br /> III. ACTIVITIES <br /> Activities will generally be as identified in the Priority Sites Scope of Work, with additional <br /> activities that may be added by mutual agreement. Key deliverables include, among others: <br /> • Existing conditions and constraints memo <br /> • Market analysis evaluating the potential for residential, commercial and institutional uses <br /> • Station access and parking management study recommending the maximum level of BART <br /> rider parking to be provided at the Site once TOD is completed, consistent with BART <br /> policies which require considering cost and design tradeoffs <br /> • Draft and final site reuse options (two to three) <br /> • Draft goals and objectives <br /> • Public outreach materials and participation in public meetings and hearings <br /> • Development framework package including revised goals and objectives for <br /> adoption/approval by the Parties <br /> IV. PROJECT SCHEDULE <br /> BART and the City will collaborate in preparing a project schedule as part of the initial activity <br /> under this MOU.The project schedule will incorporate the periods of BART review of deliverables <br /> and presentation materials referenced in Section II, above. It is anticipated that the activities <br /> described in Section III, including a community engagement process, will be completed within 24 <br /> months of the execution of this MOU. <br /> VI. MODIFICATION <br /> Any modification of this MOU will be effective only if it is executed in writing. <br /> Signatures on following page <br /> 42562.I <br /> page 4 of 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.