Laserfiche WebLink
page 4 of 21 42562.1 <br /> <br />C. Likewise, each Party agrees to provide related presentation materials for the public as well <br />as appointed and elected officials, to the other party for review and provide comment. Each Party <br />will use its best efforts to provide these presentation materials to the other Party so that it has at <br />least two (2) weeks to perform its review and provide feedback. The City will either incorporate <br />BART’s comments or meet with BART to resolve any significant differences with respect to <br />comments on presentation materials. <br /> <br />D. The Parties also agree to collaborate to identify potential funding sources to prepare the <br />Site for TOD. To the extent feasible, the Parties will lead and/or participate in the preparation of <br />grant applications for planning work and/or capital improvements. <br /> <br /> <br /> III. ACTIVITIES <br /> <br />Activities will generally be as identified in the Priority Sites Scope of Work, with additional <br />activities that may be added by mutual agreement. Key deliverables include, among others: <br />• Existing conditions and constraints memo <br />• Market analysis evaluating the potential for residential, commercial and institutional uses <br />• Station access and parking management study recommending the maximum level of BART <br />rider parking to be provided at the Site once TOD is completed, consistent with BART <br />policies which require considering cost and design tradeoffs <br />• Draft and final site reuse options (two to three) <br />• Draft goals and objectives <br />• Public outreach materials and participation in public meetings and hearings <br />• Development framework package including revised goals and objectives for <br />adoption/approval by the Parties <br /> <br /> <br />IV. PROJECT SCHEDULE <br /> <br />BART and the City will collaborate in preparing a project schedule as part of the initial activity <br />under this MOU. The project schedule will incorporate the periods of BART review of deliverables <br />and presentation materials referenced in Section II, above. It is anticipated that the activities <br />described in Section III, including a community engagement process, will be completed within 24 <br />months of the execution of this MOU. <br /> <br /> <br />VI. MODIFICATION <br /> <br />Any modification of this MOU will be effective only if it is executed in writing. <br /> <br /> <br />Signatures on following page <br /> <br />Docusign Envelope ID: 094A4C1A-13D7-44EA-BE42-B0F1E0142890Docusign Envelope ID: 663B3163-E73A-4E80-A759-F92FA9FC8D9D