Laserfiche WebLink
<br />City of Pleasanton 2 Woodard & Curran, Inc. Arroyo Lago Sewer Impact Study September 3, 2025 <br />• Option 2 would convey Arroyo Lago and East Lakes flows through a new alignment <br />along Mohr Avenue and Iron Horse Trail; Amazon flows would follow Busch Road to <br />Ironwood Drive to the above network. <br />Woodard & Curran will summarize the model results in a brief Technical Memorandum (TM) <br />for review by the City. The TM will document the model updates and assumptions made for <br />the evaluation and include model hydraulic profile plots of the flow in the relevant downstream <br />sewers. <br />The TM will also identify where public sewer improvements (e.g., pipe upsizing) may be needed <br />to serve each development scenario, and the sizing of any new or upsized sewers. As the proposed developments contribute to Capacity Project 4, identified in the City’s Capacity <br />Evaluation Report, the evaluation will also determine how the proposed Capacity Project 4 <br />would need to change to accommodate the additional flows, based on the two conveyance alternatives described above. The pro-rata share for each of the proposed developments <br />(Arroyo Lago, East Lakes, and Amazon) to the Capacity Project 4 project cost will be determined for each of the scenarios. Comments received from the City will be incorporated into a final TM. <br />Task 3 – Task Order Scope Preparation, Administration, and Coordination <br />• This task covers overall contract management related to this task order and preparation <br />of this draft task order scope of work for City’s review and approval. An overall two- <br />month task order period is assumed. Woodard & Curran will monitor project budget <br />and schedule, prepare invoices, and communicate with the City by telephone and e- <br />mail regarding project status and issues. <br />Deliverables: <br />• Draft task order scope and budget <br />• Draft and final summary TMs <br />• Monthly invoice and task order progress report <br />Estimated Cost <br />The estimated level of effort and cost for completing the scope of services described above is <br />$18,335 as detailed in the table below. <br /> <br />Project <br />Manager <br />Project <br />Engineer <br />PIC/Sr. <br />Tech. <br />Review <br />STM PE2 STPL PA <br />$355 $295 $375 $145 <br /> Arroyo Lago Sewer Impact Study Update <br />1 - Create Model Loading Scenarios 6 14 20 $6,260 <br />2 - Evaluate Adequacy of Sewer System 10 20 2 32 $10,200 <br />3 - Task Order Scoping, Admin, Coordination 3 1 3 7 $1,875 <br />Original TOTAL 19 34 3 3 59 $18,335 <br />1. Labor costs include salary, overhead, and profit. Invoices will be based on Woodard & Curran standard hourly rates at the time the <br />work is performed. <br />Total <br />Estimated <br />Fee (1) <br />Admin. <br />SupportTask/Subtask Total <br />Hours <br />Docusign Envelope ID: 0302045F-9523-48FC-9A90-361BBDC311F7Docusign Envelope ID: 3D1FEB1B-42D1-48A5-8938-A1A827EFEF43