Laserfiche WebLink
Page 2 of 14 <br />BACKGROUND <br />Project Origins and Purpose <br />The Pleasanton General Plan identifies East Pleasanton as an area of special interest, but <br />provides limited policy guidance as to how it should be developed. Land Use Element Program <br />6.1 calls for the City to “Prepare a Specific Plan for East Pleasanton as a coordinated effort <br />between property owners, major stakeholders, and the Pleasanton community, including <br />residents of East Pleasanton.” The boundaries of the East Pleasanton Specific Plan (EPSP) <br />area, as established in the General Plan, are shown in Figure 1 below. The General Plan <br />anticipates that a range of different allowed land uses, including both development and open <br />space uses, would be considered in East Pleasanton as part of the EPSP process. <br /> <br />Figure 1: East Pleasanton Specific Plan Boundaries <br /> <br /> <br />City efforts to prepare an East Pleasanton Specific Plan began in 2012. After substantial public <br />participation, a draft Specific Plan and Environmental Impact Report was published in 2014. <br />The draft Specific Plan presents a vision for the future of East Pleasanton with detailed policies <br />relating to land use, urban design, transportation, environmental protection, and public <br />infrastructure and services. Work on the Specific Plan paused in 2015 and resumed in 2019. In <br />2020, work on the Specific Plan stopped again due to the pandemic and other considerations. <br />The draft Specific Plan was ultimately never adopted. <br /> <br />At the October 3, 2023 City Council meeting, the City Council approved its first-ever 5-Year <br />Citywide Strategic Plan, ONE Pleasanton. The plan serves as a roadmap for the city from <br />2023 to 2028, and addresses a wide range of critical issues, from infrastructure and economic <br />growth to environmental sustainability and community wellbeing. Advancing the East <br />Page 3 of 91