Laserfiche WebLink
EPPF Process <br />and Schedule <br />10 <br />Background Materials <br />•One Pleasanton 5-Year Strategic <br />Plan (2023) <br />•General Plan (2009) <br />•Trails Master Plan (2019) <br />•Bicycle and Pedestrian Master <br />Plan (2018) <br />•Climate Action Plan (2022) <br />•Draft East Pleasanton Specific <br />Plan (2014) <br />•Draft EIR for the East Pleasanton <br />Specific Plan (2014) <br />•East Pleasanton Fiscal Impact <br />Analysis (2024) <br />•Economic and Market Analysis for <br />East Pleasanton Specific Plan (2013) <br />•Development project plans and <br />materials (2025) <br />City of Pleasanton Documents <br />11 <br />Page 45 of 91