My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
091625 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2025 3:30:34 PM
Creation date
10/10/2025 3:15:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/16/2025
DESTRUCT DATE
15Y
DOCUMENT NO
REGULAR MEETING AGENDA PACKET
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> MAINTENANCE AND TRADE SERVICES AGREEMENT <br />FOR UTILITIES – DENKER DRIVE EMERGENCY SEWER REPAIRS <br />CIP PROJECT NO. 26203 <br /> <br />THIS AGREEMENT is made and entered into this 21st day of August 2025 between <br />DPI, Inc. ("Contractor"), a California Corporation, whose address is 5942 Las Positas Road, Livermore <br />CA 94551 and the CITY OF PLEASANTON, a municipal corporation ("City"). <br /> <br />RECITALS <br /> <br />A. Contractor has submitted a proposal in response to the City of Pleasanton’s Request for Proposals <br />(RFP) #PWD 24.601 and is qualified and experienced in providing Underground Infrastructure Repair <br />Services for our Utilities System Operations as set forth in Exhibit A of this Agreement. <br /> <br />B. City found it necessary and advisable to obtain services from Contractor to perform emergency <br />services to replace 245 feet of 8-inch sewer line and asscoiated work on Denker Drive between <br />Inglewood Drive and Beech Court. <br /> <br />NOW THEREFORE, in consideration of the mutual covenants and conditions in this Agreement, <br />City and Contractor agree as follows: <br /> <br />1. Term. The term of this Agreement commences on the date written above and will expire upon <br />completion of the necessary repairs and satisfaction as determined by the City. <br /> <br />2. Services to be performed. Contractor shall perform, or cause to be performed, the work as <br />directed by the City Engineer and will be paid on a time and material basis. <br /> <br />3. Compensation. Total compensation pursuant to this Agreement shall not exceed $500,000 and <br />completed as Time and Material following the approved rates for the “As-Needed Maintenance <br />and Trade Services Agreement for Utilties – Water,Sewer,& Storm Maintenace & Emergency <br />Repairs RFP #PWD 24-601.” <br /> <br />a. Payment shall be made within thirty (30) days of receipt of Contractor’s invoice and approval <br />by City. <br /> <br />b. If the prevailing wage for crafts or classifications subject to this Agreement change during the <br />term of this Agreement, the City will accept corresponding increases in Contractor’s hourly <br />rates when sufficient documentation is received from the Contractor and verified with the <br />Department of Industrial Relations. <br /> <br />4. Indemnification. Contractor shall hold harmless, defend, and indemnify the City, its officers, <br />agents and employees (“Indemnities”), against any and all claims, costs, demands, causes of <br />action, suits, losses, expenses, attorney’s fees, or liability, arising from or in any manner related to <br />Contractor’s (includes Contractor’s employees, agents, or subcontractors) negligent act or <br />omission, whether alleged or actual, regarding the work or services performed or caused to be <br />performed pursuant to this Agreement and any amendments thereto. Contractor shall not, however, <br />Page 134 of 264
The URL can be used to link to this page
Your browser does not support the video tag.