Laserfiche WebLink
City of Pleasanton <br />Emergency Operations Plan <br /> C-1 June 2025 <br />IN <br />C <br />I <br />D <br />E <br />N <br />T <br /> <br />M <br />A <br />N <br />A <br />G <br />E <br />M <br />E <br />N <br />T <br /> <br />T <br />E <br />A <br />M <br /> <br />APPENDIX C. EMERGENCY ACTION PLAN “PLANNING P” <br />Emergency action plans provide designated personnel with knowledge of the objectives to be attained <br />and the steps required for achievement. Action plans give direction and provide a basis for measuring the <br />achievement of objectives and overall system performance in the EOC. The EOC Director will determine <br />and direct the drafting of EAPs. The Planning Section is responsible for overseeing EAP development. <br />Planning strategy may include the incorporation of the “Planning P” as shown below (so called because <br />the diagram is in the shape of the letter “P”). The “Planning P” provides useful planning guidance during <br />EOC activations. Below is an example of the EOC Planning Cycle: <br /> <br />Page 244 of 264