My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
100725 REGULAR
>
CITY COUNCIL REGULAR AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2025 3:27:07 PM
Creation date
10/10/2025 3:21:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/7/2025
DESTRUCT DATE
15Y
DOCUMENT NO
CITY COUNCIL REGULAR MEETING AGENDA PACKET 10/7/25
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton | Stormwater System Management Plan | PWD 25.601 | PAGE 12 <br />elevations. The LiDAR‐derived facility rim or ground elevations will be used in conjunction with inspection data to verify the record <br />drawing data. <br />The spatially‐rectified facilities will be used in conjunction with the georeferenced record drawings to realign storm drain alignments <br />and to identify other paved‐over facilities, such as junction boxes and transition structures. The georeferenced record drawings will <br />also be used to record storm drain materials, diameter/dimensions, lengths, and upstream and downstream inverts (both original <br />and converted NAVD 88 datum). <br />The geodatabase will include an inventory of all the storm drains, grade breaks (storm drain invert slope changes), maintenance <br />holes, outfalls, junction boxes, large trash capture devices and transition structures. <br />Deliverable(s): Georeferenced as‐builts for 10 miles of drainage facility | Updated geodatabase <br />Task 2.6 – Survey & Inspection <br />Wood Rodgers will perform site visits, surveys, and inspections to supplement the data gaps identified in the Data Collection task <br />(Task 2.3) and to collect sufficient storm drain condition <br />information for assessment. <br />Wood Rodgers will prioritize, survey, and inspect storm drain <br />facilities at crucial locations along the storm drain systems. <br />This strategic approach minimizes the need for extensive <br />inspection and closed‐circuit television (CCTV) efforts, <br />allowing us to focus on the quality of the survey. The <br />prioritization of sites for inspection will be based on the <br />likelihood of deficiencies, which will be determined through <br />our technical analysis, modeling results, topography, and <br />previous inspection experience. This approach typically incurs <br />only 10‐20% of the total spot or CCTV inspection costs. <br />Wood Rodgers’ strategic prioritization approach (see Exhibit 5) has <br />been developed and refined through our extensive experience <br />with storm drain inspections. This cost‐saving strategy focuses on surveying and inspecting facilities at crucial locations including <br />upstream and downstream ends, major junctions or bends, metal pipes beyond their service life, steep systems at open spaces, <br />systems prone to high backwater sediment, areas with joint separation risks, andlocations with high trash loading. Our experience <br />has found that this approach allows for the accurate collection of overall storm drain system geometry and materials. Additionally, it <br />enables us to predict and inspect up to 80% of existing deficiencies. <br />A system‐wide survey and inspection plan will be developed for City review prior to beginning field work. <br />Wood Rodgers will document the storm drain survey technique, procedures, and equipment used to <br />accurately measure pipe inverts, diameters, and locations. Conventional maintenance hole dipping surveys <br />will not yield accurate pipe diameters or inverts because the eyeballing technique is not accurate when <br />the ground is 10 to 20 feet above the pipes. Wood Rodgers’ technique with modified equipment and LiDAR <br />scanners (see Exhibit 6) has been used successfully with high accuracy for multiple agencies. <br />Maintenance holes, junction boxes, transition <br />structures, and storm drains’ horizontal GPS <br />coordinates (X,Y) will be surveyed; storm drains’ <br />diameters and inverts will be measured; storm drains’ materials and <br />flow directions will be recorded; sediment and debris depths will be <br />estimated and documented with pictures and field notes; and any <br />structural deficiencies such as corroded metal pipes and cracked walls, <br />will be documented with field notes and pictures. Wood Rodgers will <br />also visit major storm drain outfall structures to inspect for any <br />structural integrity, sediment, and erosion problems. Outfall structure <br />flap gate and cathodic protection system conditions will also be <br />assessed and documented. The collected data, pictures, and notes will <br />be stored in the geodatabase. We will provide a survey and inspection <br />report for each site as shown here in Exhibit 7. <br />Exhibit 7 <br />Exhibit 5 <br />Exhibit 6 <br />EXHIBIT A <br />Page 169 of 376
The URL can be used to link to this page
Your browser does not support the video tag.