My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
100725 REGULAR
>
CITY COUNCIL REGULAR AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2025 3:27:07 PM
Creation date
10/10/2025 3:21:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/7/2025
DESTRUCT DATE
15Y
DOCUMENT NO
CITY COUNCIL REGULAR MEETING AGENDA PACKET 10/7/25
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Park Planet <br />a Division of Park Associates, Inc. <br />415 Elm Street <br />Red Bluff CA 96080 <br />Quote# Q25-3753 <br />Del Prado Park & Moller Park <br />Parks Combined <br />Description Vendor Qty Rate Amount <br />IF APPLICABLE: <br />1. Park Planet installers are not signatory to any unions and <br />will not sign any PLA for the installation of the playground or <br />special playground surfacing. The following supply and/or <br />installation estimates do not include signing a PLA or paying <br />any union labor or fees. All of the labor quoted herein will <br />need to be excluded from a PLA agreement and union labor <br />requirement waived by the purchasing agency, owner or <br />District. <br />2. Skilled & Trained Workforce: If this project is a Lease Lease- <br />Back, or Design-Build Project, or a contract that triggers the <br />Skilled and Trained Workforce requirements for a Public Works <br />project, please contact Park Planet immediately. The <br />Following estimate for equipment and/or labor does NOT <br />include such compliance. Park Planet and their subcontractors <br />will NOT comply with Skilled and Trained Workforce labor and <br />reporting. Park Planet's portion of work (and our <br />subcontractor's work) will need to fall within an exception or <br />waiver to the Skilled and Trained Workforce requirements or <br />our estimate will not be valid. <br />EXCLUSIONS <br />Location/Marking of utility, plumbing and irrigation lines <br />Dumpster for trash and packaging materials <br />Offloading and storage of equipment <br />Moving equipment from storage site to construction site <br />Site preparation not specifically stated <br />Drainage Consideration <br />Inspections, material testing, or applicable permits and fees <br />Removal of obstacles in access route <br />Landscape/Hardscape repair based on access route <br />Cleaning of structure(s) is excluded unless otherwise stated <br />Site security <br />Bonding or Special Insurance - fees may apply if required <br />By signing below, you acknowledge and agree to our <br />Contract; Exclusions, Conditions & Payment Terms, which are <br />to be included in, and supersede any additional contracts or <br />sub-contract agreements made separately based on this <br />"Estimate". Unless otherwise specified above we Exclude <br />Responsibility for: additional mobilizations due to delays or <br />layout conflicts, conditions unforeseen and/or not disclosed at <br />time of estimate, repairing unmarked underground utilities and <br />pipes. Site Conditions Prior to Installation: Grades; stable, <br />compacted, & workable (rough grade to be taken + or - one <br />tenth of one inch), adequate access to work site provided for <br />workmen, materials, tools & equipment. Quote assumes all <br />labor to be completed without interruption. <br /> <br />Subtotal $158,928.06 <br />Tax Total (%)$7,322.42 <br /> Total $166,250.48 <br /> <br />Page 203 of 376
The URL can be used to link to this page
Your browser does not support the video tag.