Laserfiche WebLink
Page 3 of 5 <br />structure is demolished in conjunction with the construction of, or converted to, an ADU. SB <br />1211 amends this subsection to also prohibit local agencies from requiring replacement <br />parking when an uncovered parking space is demolished for or replaced with an ADU. <br /> <br />Multifamily ADUs <br />Under existing Government Code section 66323(a)(3)(A), local agencies must ministerially <br />approve qualifying building permit applications for ADUs within “portions of existing multifamily <br />dwelling structures that are not used as livable space, including, but not limited to, storage <br />rooms, boiler rooms, passageways, attics, basements, or garages ….” The term “livable <br />space” is not defined by State ADU law. SB 1211 changes this by adding a new definition <br />stating “‘livable space’ means a space in a dwelling intended for human habitation, including <br />living, sleeping, eating, cooking, or sanitation.” <br /> <br />SB 1211 also increases the quantity of detached ADUs allowed on lots with an existing <br />multifamily dwelling. Currently, Government Code section 66323(a)(4)(A) permits lots with an <br />existing or proposed multifamily dwelling up to two detached ADUs. Following SB 1211, lots <br />with an existing multifamily dwelling can have up to eight detached ADUs, or as many <br />detached ADUs as there are primary dwelling units on the lot, whichever is less. SB 1211 does <br />not alter the number of ADUs that lots with proposed multifamily dwellings can have — they <br />remain limited to two detached ADUs. <br /> <br />To be consistent with these changes, Exhibit A to Attachment 1 of this agenda report provides <br />the revised text to Chapter 18.106 of the PMC. <br /> <br />Separate Conveyance of ADUs <br />Since AB 1033 was adopted, very few jurisdictions have adopted an ordinance allowing the <br />separate conveyance of ADUs. In staff’s research, San José and San Francisco are the only <br />Bay Area jurisdictions to do so. Other jurisdictions have provided discussion of the new law to <br />their decision-making bodies, but in most cases have suggested deferring development of <br />local regulations, pending being able to gauge interest from the development community, and <br />to benefit from the experience of other jurisdictions in developing and implementing an <br />ordinance. <br /> <br />The San José “ADU Condominium” ordinance, adopted on June 18, 2024 (February 12, 2025 <br />Planning Commission packet, page 28), demonstrates the complexity of the process. To date, <br />San José has received one application for ADU Condominium conversion. As can be seen in <br />the ordinance, the requirements are lengthy and complex, since they need to ensure that the <br />separate conveyance included adequate provisions for management and maintenance of <br />common areas, including lienholder consent and the formation of a homeowners association <br />for the primary unit and ADU. <br /> <br />No jurisdictions similar to Pleasanton (i.e. with a large number of planned unit developments <br />and active HOAs) have adopted an ordinance to permit separate conveyance. Many <br />residential neighborhoods in Pleasanton are part of a Planned Unit Development and subject <br />to an HOA and its CC&Rs (covenants, conditions and restrictions). Allowing separate <br />conveyance for properties with existing HOAs could raise complex questions about how dues <br />would be assessed, and how ADU subdivisions would interface with existing CC&Rs and <br />property maintenance and easement agreements. <br /> <br />Page 78 of 376