City of Pleasanton | Stormwater System Management Plan | PWD 25.601 | PAGE 22  <br />Geosyntec will prepare a rough cost estimate for implementing the maintenance and inspection program. Findings will be  <br />summarized in a draft and final Maintenance and Inspection Plan prepared by Wood Rodgers.  <br />STAFFING, FUNDING, EQUIPMENT AND VEHICLE RECOMMENDATIONS | Recommendations will be made based on an  <br />evaluation of the maintenance records and refined procedures. This will include recommendations for adequate staffing, equipment,  <br />and vehicles to perform the recommended activities; a schedule for future inspections; and appropriate annual funding levels for  <br />repairs of the City’s storm drainage infrastructure that fall within the City’s capabilities. The recommendations will consider the City’s  <br />existing asset management systems and policies.  <br />ENVIRONMENTAL PERMITTING ASSESSMENT | Wood Rodgers will work with the City to identify and map all natural water ways  <br />and drainages in the City that may require routine maintenance. Our environmental staff will perform a desktop review of these  <br />drainage facilities and provide the City with preliminary recommendations for which facilities should be considered Waters of the  <br />U.S./State and which are non‐jurisdictional, and which facilities fall under the City’s existing Stream Maintenance Permit (SMP). This <br />effort will provide the City with a better understanding of when maintenance work would require environmental permits, when it <br />could be performed under the SMP, and when it could be performed without regulatory agency coordination. Wood Rodgers <br />recommends the City consider obtaining future long‐term maintenance agreement permits for citywide stormwater master plan <br />maintenance activities in the future (not included in this scope of work). <br />REPORTING | Describes necessary documentation required for the City’s internal work tracking. This also includes reporting  <br />measures required by federal, state, and local resource agencies.  <br />Deliverable(s): Draft and Final Maintenance and Inspection Plan  <br />Task 7 | Regulatory Assessment and Master Plan Updates Approach <br />Geosyntec is intimately familiar with the Alameda Countywide Clean Water Program (ACCWP) and the San Francisco Bay Area  <br />Municipal Regional Stormwater Permit (MRP) requirements for the City of Pleasanton. Geosyntec has served as a technical resource  <br />to the ACCWP for stormwater program implementation planning since 2005 in planning, coordinating, and implementing programs.  <br />Additionally, Geosyntec is currently assisting the City with implementing its GSI Plan by developing GSI technical guidance and  <br />assessing existing City‐owned GSI facilities at 30 sites.  <br />The MRP requirements are discussed in the subsequent paragraphs to demonstrate our familiarity with them.  <br />National Pollutant Discharge Elimination System (NPDES) permit requirements associated with Phase I municipal stormwater  <br />programs and Permittees in the San Francisco Bay area are included in the MRP. Permit discussions for MRP 4.0 will begin in the Fall  <br />of 2025. Geosyntec will be engaged in these discussions on behalf of the ACCWP and the Bay Area Municipal Stormwater  <br />Collaborative (BAMSC).  <br />Provision C.3.h requires each Permittee to implement an Operation and Maintenance (O&M) Verification Program in accordance with  <br />the requirements specified in the Provision.  <br />MRP Provision C.3.j requires each Permittee to continue to implement a Green Infrastructure (GI) Plan for the inclusion of LID storm  <br />drain infrastructure on public and private lands. Additionally, Provision C.3.j.ii.(2) requires the City to implement non‐regulated green  <br />infrastructure projects within its jurisdictions so that 4.91 acres of impervious surface are retrofitted with GSI by June 30, 2027.  <br />Provision C.5.f requires Permittees to make the current map(s) of its MS4 available to the public. Permittees must identify  <br />information missing from the current MS4 maps and develop a plan and schedule to compile additional storm sewer system  <br />information, considering the potential to identify component locations, size or specifications, materials of construction, and  <br />condition.  <br />MRP Provision C.10 requires Permittees to reduce their trash load by 100% by June 30, 2025, using either full trash capture devices  <br />(FTCD) or other control measures. Provision C.10.b.i requires Permittees to maintain and provide for inspection and review upon  <br />request, documentation of the design, operation, and maintenance of each of their FTCDs, including the mapped location and  <br />drainage area served by each system. The City is also required to conduct On‐land Visual Trash Assessments (OVTAs) for the trash  <br />management areas controlled with other trash management actions, such as street sweeping.  <br />With an understanding of the MRP requirements, Geosyntec proposes the following tasks to address deficiencies and achieve water  <br />quality objectives in compliance with State‐mandated regulations.  <br />7.1 – General <br />Wood Rodgers’ team, including Geosyntec, will review and assess applicable Permittee‐specific MRP regulatory requirements with  <br />City's stormwater MRP operation and maintenance practices and provide City with recommendations for any areas of  <br />need/improvement based off of the minimum required effort necessary to meet/maintain compliance. This includes  <br />guidance/recommendations with evolving MRP regulations as updated by the Water Board.   <br />EXHIBIT A <br />Docusign Envelope ID: DF86282A-2A84-404C-9F8A-A035AEFBCFF8