Laserfiche WebLink
EXHIBIT “B” <br /> <br /> <br />OAKLAND FEE SCHEDULE <br /> <br /> <br />CLASSIFICATION STANDARD RATE <br />Principal Engineer/Geologist/Surveyor/Planner/GIS/LA* II $360 <br />Principal Engineer/Geologist/Surveyor/Planner/GIS/LA* I $315 <br />Senior Engineer/Geologist/Surveyor/Planner/GIS/LA* II $295 <br />Senior Engineer/Geologist/Surveyor/Planner/GIS/LA* I $285 <br />Project Engineer/Geologist/Surveyor/Planner/GIS/LA* II $265 <br />Project Engineer/Geologist/Surveyor/Planner/GIS/LA* I $250 <br />Engineer/Geologist/Surveyor/Planner/GIS/LA* II $240 <br />Engineer/Geologist/Surveyor/Planner/GIS/LA* I $230 <br />Assistant Engineer/Geologist/Surveyor/Planner/GIS/LA* $200 <br />Designer $105 <br />Senior CAD Technician/Graphics Designer II $220 <br />Senior CAD Technician/Graphics Designer I $205 <br />CAD Technician/Graphics Designer $180 <br />Project Coordinator $190 <br />Administrative Assistant $170 <br />Construction Manager $360 <br />1 Person Survey Crew $260 <br />2 Person Survey Crew $370 <br />3 Person Survey Crew $470 <br />Consultants, Outside Services, Materials & Direct Charges Cost Plus 10% <br />Overtime Work, Expert Witness Testimony and Preparation Rate Plus 50% <br /> <br />*LA = Landscape Architect <br /> <br />Blueprints, reproductions, and outside graphic services will be charged at vendor <br />invoice. Auto mileage will be charged at the IRS standard rate, currently 67 cents per <br />mile. <br /> <br />Fee Schedule subject to change January 1, 2026. <br /> <br />Docusign Envelope ID: DF86282A-2A84-404C-9F8A-A035AEFBCFF8