My WebLink
|
Help
|
About
|
Sign Out
WOOD RODGERS, INC. (#2026291)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
W
>
WOOD RODGERS, INC. (#2026291)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2025 10:05:24 AM
Creation date
11/6/2025 10:02:37 AM
Metadata
Fields
Template:
CONTRACTS
Description Type
Professional Services
Contract Type
New
NAME
WOOD RODGERS, INC.
Contract Record Series
704-05
Munis Contract #
2026291
Contract Expiration
10/13/2029
NOTES
STORMWATER SYSTEM MANAGEMENT PLAN, CIP NO. 25659
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 3 <br />maps, drawings, and other related documents, development of hydrologic and hydraulic <br />evaluation criteria, hydraulic and hydrologic analysis of the watershed areas and system <br />components, and establishing recommendations for rehabilitation, maintenance practices, <br />asset management, and other improvements. The City intends to use this study to establish <br />and prioritize storm drainage capital improvement projects, identify permitting requirements, <br />and develop improved maintenance and management practices and standards that address <br />water quality issues consistent with the City’s National Pollutant Discharge Elimination System <br />(NPDES) stormwater discharge permit and other associated stormwater management <br />guidelines and regulations. <br /> <br />Financial sustainability for operations and maintenance, regulatory compliance, and capital <br />facility improvements is an overriding concern for many agencies owning and operating <br />stormwater drainage facilities. Agency General Funds are typically insufficient to cover the <br />ever-increasing costs; therefore, agencies have looked at other forms of funding, mostly <br />through property-owner-approved stormwater utility fees. <br /> <br />DISCUSSION <br />This Stormwater System Management Plan (Plan) will assess the adequacy of the existing <br />infrastructure through development of a hydraulic model and condition assessments, leading to <br />a 20-year Capital Improvement Plan. This plan will also assess the regulatory environment, <br />and the cost to maintain regulatory compliance, along with assessment of staffing <br />requirements for operations and maintenance. All of these unique costs will be used to drive <br />decision-making for revenue generation, planning and actions by 2029. <br /> <br />A Request for Proposals (RFP) for professional services was advertised on April 29, 2025, for <br />the development of a Stormwater System Management Plan. On June 18, 2025, four <br />proposals were received from Wood Rodgers, Inc., Carollo Engineers, Woodard & Curran, and <br />BKF Engineers. After reviewing the proposals, all four firms were invited to panel interviews on <br />July 9, 2025. Based on the evaluation criteria in the RFP, Wood Rodgers was unanimously <br />selected as the most qualified firm. <br /> <br />Staff recommends that the City Council authorize the City Manager to enter into an agreement <br />with Wood Rodgers, Inc. to develop the Stormwater System Management Plan. <br /> <br />EQUITY AND SUSTAINABILITY <br />Staff followed the City Procurement Policy for purchasing procedures and previously approved <br />Council provisions. <br /> <br />OUTREACH <br />No outreach has been conducted to date. However, community workshops will likely be held <br />during the development phase of the Plan to describe the goals of the plan and elicit <br />community input and support. The Plan includes scope to seek support from property owners <br />to collect stormwater utility fees to fund operations and maintenance costs, as well as capital <br />improvements. <br /> <br />STRATEGIC PLAN ALIGNMENT <br />Approval of this action advances the Citywide strategic goal of Funding our Future, Strategy 1 <br />– Develop a long-term strategy of funding operation and maintenance needs to assure <br />Docusign Envelope ID: DF86282A-2A84-404C-9F8A-A035AEFBCFF8
The URL can be used to link to this page
Your browser does not support the video tag.