Laserfiche WebLink
City  of Pleasanton | Stormwater S y stem Management Plan | PWD 25.601 | PAGE 6  <br />0 <br />WOOD RODGERS <br />3,30 <br />70 <br /> <br />Differentiators <br />IMPLEMENTATION2PLAN <br />25Years <br />of Bay Area drainage master plan <br />experience, including + <br />Miles <br />of pipes <br />risk-based hydrologic & hydraulic 100 <br />Project Understanding + Approach <br />Storm Drain Master Plans for a city the size of Pleasanton  <br />necessitates a blend of resources, profound knowledge,  <br />technology, and experience for successful execution within time  <br />and budget constraints. Wood Rodgers has demonstrated a  <br />particular focus on crafting high‐quality and detailed drainage  <br />master plans over the past two decades. Our water resources  <br />group consistently delivers multiple drainage master plans each  <br />year. Notably, we have successfully developed storm drainage  <br />master plans for municipalities similar to Pleasanton, with  <br />extensive storm drain networks nearing or exceeding 200 miles,  <br />subject to open channel high tailwater conditions, and closely  <br />integrated with Zone 7 drainage facilities. These master plans  <br />include the Alameda County Zone 12 Drainage Master Plan (400  <br />miles of pipes), City of Oakland Drainage Master Plan (500 miles  <br />of pipes), San Jose Citywide Storm Sewer Master Plan (1,200 miles  <br />of pipes), Valley Water Guadalupe River Modeling (600 miles of  <br />modeling using <br />$ <br />million <br /> <br />flow <br />gages <br />pipes), City of Berkeley Storm Master Plan (150 miles of pipes),  <br />among others.  <br />Given our experience, we recognize that the City of Pleasanton likely  <br />faces challenges similar to those we have successfully navigated for  <br />other public agencies:  <br />▪Aging facilities beyond their standard service life. <br />▪Reactive maintenance and capital projects that lack cost‐  <br />effectiveness. <br />▪Conservative design parameters that may not be  <br />economically feasible to implement.  <br />in awarded flood mitigation grants ▪Resource constraints that necessitate the development of  <br />an additional funding mechanism.  <br />▪Multiple flood control objectives driven by diverse <br />stakeholder priorities <br />Built upon extensive drainage master plan experience, Wood  <br />Rodgers proposes the following unique approach to navigate  <br />those challenges.  <br />100+ <br />EXHIBIT A <br />Docusign Envelope ID: DF86282A-2A84-404C-9F8A-A035AEFBCFF8