My WebLink
|
Help
|
About
|
Sign Out
ITEM 5 EXHIBITS A-H
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
11-12
>
ITEM 5 EXHIBITS A-H
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2025 5:53:56 PM
Creation date
11/7/2025 5:11:43 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/12/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HCM 7th Signalized Intersection Summary Existing PM <br />1: Santa Rita Rd & Black Ave 12/18/2024 <br />4400 Black Avenue Synchro 12 Report <br />Page 1 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Volume (veh/h) 151 12 91 9 12 21 76 732 3 12 720 158 <br />Future Volume (veh/h) 151 12 91 9 12 21 76 732 3 12 720 158 <br />Initial Q (Qb), veh 000000000000 <br />Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Ped-Bike Adj(A_pbT) 0.99 0.97 0.99 0.99 1.00 0.99 1.00 0.96 <br />Parking Bus, Adj 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 1.00 1.00 1.00 1.00 <br />Work Zone On Approach No No No No <br />Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 <br />Adj Flow Rate, veh/h 174 14 105 10 14 24 87 841 3 14 828 182 <br />Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 <br />Percent Heavy Veh, % 222222222222 <br />Cap, veh/h 449 24 288 132 120 152 133 1783 6 25 1236 272 <br />Arrive On Green 0.25 0.22 0.22 0.25 0.22 0.21 0.07 0.49 0.46 0.01 0.43 0.40 <br />Sat Flow, veh/h 1321 108 1313 147 547 693 1781 3632 13 1781 2871 631 <br />Grp Volume(v), veh/h 188 0 105 48 0 0 87 411 433 14 512 498 <br />Grp Sat Flow(s),veh/h/ln 1428 0 1313 1387 0 0 1781 1777 1868 1781 1777 1726 <br />Q Serve(g_s), s 3.6 0.0 3.0 0.0 0.0 0.0 2.1 6.7 6.7 0.3 10.0 10.1 <br />Cycle Q Clear(g_c), s 4.7 0.0 3.0 1.2 0.0 0.0 2.1 6.7 6.7 0.3 10.0 10.1 <br />Prop In Lane 0.93 1.00 0.21 0.50 1.00 0.01 1.00 0.37 <br />Lane Grp Cap(c), veh/h 521 0 288 451 0 0 133 872 917 25 765 743 <br />V/C Ratio(X)0.36 0.00 0.37 0.11 0.00 0.00 0.65 0.47 0.47 0.55 0.67 0.67 <br />Avail Cap(c_a), veh/h 1191 0 921 1093 0 0 1229 1683 1769 1024 1683 1634 <br />HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Uniform Delay (d), s/veh 14.4 0.0 14.4 13.7 0.0 0.0 19.6 7.3 7.3 21.3 9.9 10.1 <br />Incr Delay (d2), s/veh 0.2 0.0 0.3 0.0 0.0 0.0 2.0 0.4 0.4 6.7 1.1 1.1 <br />Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 <br />%ile BackOfQ(50%),veh/ln 1.3 0.0 0.8 0.3 0.0 0.0 0.8 1.7 1.8 0.2 3.0 2.9 <br />Unsig. Movement Delay, s/veh <br />LnGrp Delay(d), s/veh 14.6 0.0 14.7 13.7 0.0 0.0 21.6 7.8 7.8 28.0 11.0 11.3 <br />LnGrp LOS B B B C A A C B B <br />Approach Vol, veh/h 293 48 931 1024 <br />Approach Delay, s/veh 14.6 13.7 9.1 11.4 <br />Approach LOS BBAB <br />Timer - Assigned Phs 1 2 4 5 6 8 <br />Phs Duration (G+Y+Rc), s 7.3 22.7 13.5 4.6 25.4 13.5 <br />Change Period (Y+Rc), s 4.0 5.2 4.5 4.0 5.2 4.5 <br />Max Green Setting (Gmax), s 30.0 40.0 30.0 25.0 40.0 30.0 <br />Max Q Clear Time (g_c+I1), s 4.1 12.1 6.7 2.3 8.7 3.2 <br />Green Ext Time (p_c), s 0.1 5.3 0.7 0.0 4.1 0.1 <br />Intersection Summary <br />HCM 7th Control Delay, s/veh 10.9 <br />HCM 7th LOS B
The URL can be used to link to this page
Your browser does not support the video tag.