My WebLink
|
Help
|
About
|
Sign Out
ITEM 5 EXHIBITS A-H
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
11-12
>
ITEM 5 EXHIBITS A-H
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2025 5:53:56 PM
Creation date
11/7/2025 5:11:43 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/12/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 32 <br /> <br />adequate freeboard given the design storm event assuming all bioretention areas are <br />overflowing. Said calculations shall be prepared, stamped, and signed by a <br />California-licensed civil engineer. (Address this condition prior to plan approval) <br /> <br />108. POTABLE WATER SYSTEM DESIGN STANDARDS. All permanent connections to <br />the City’s potable water network shall conform to Pleasanton Municipal Code <br />§14.04.050. Any required water pressure and/or flow needed by the applicant beyond <br />that available from the network at the point-of-connection must be provided by the <br />applicant as a private improvement on the customer side of the meter or backflow <br />prevention device. All extensions or upgrades to the potable water network shall be <br />designed to satisfy the following minimum standards: <br /> <br />a. Minimum pressures: <br />I. 40 psi (peak hour demand) <br />II. 20 psi (maximum day demand plus fire flows) <br />(Address this condition prior to plan approval) <br /> <br />109. UTILITY ENCLOSURES. Proposed utility enclosures including vaults, meter boxes, <br />splice boxes, and pedestals shall be installed in the public right-of-way, in a public <br />service easement (PSE), or in a utility company specific easement. The locations for <br />utility enclosures shall be considered in the following order of preference: (1) PSE <br />area behind public sidewalk; (2) parkstrip area between the roadway curb & gutter and <br />the sidewalk; (3) within the public sidewalk set flush to grade; (4) within driveway <br />approach areas set flush to the surface with traffic-rated lids. In no case shall an <br />above-ground pedestal or utility cabinet obstruct sight-line visibility for vehicle drivers <br />at intersections or driveways. Above-ground pedestals or utility cabinets are preferred <br />within the side-yard area of a corner residential lot rather than the front-yard. <br />Deviations from this standard must be approved by the City Engineer. (Address this <br />condition prior to plan approval) <br /> <br />110. DRY UTILITIES (ELECTRICITY, CATV, TELECOM): All dry utilities including <br />electricity, telecommunications, cable television, street lights, alarm systems, etc. <br />required to serve the project shall be installed underground from the point-of- <br />connection at the utility purveyor’s network to the service point. Aerial drops from <br />utility poles will not be allowed without prior approval of the City Engineer. (Address <br />this condition prior to plan approval) <br /> <br />111. ENCROACHMENT PERMIT. Any work performed within the City’s right-of-way, City <br />easements, or City-owned property shall be subject to an Encroachment Permit as <br />defined in Pleasanton Municipal Code Chapter 13.04. All encroachment permit work <br />is subject to adopted City of Pleasanton Standard Specifications and Details, and shall <br />be performed by properly-licensed contractors as determined by the City Engineer. <br />Said contractors must provide evidence of proper licensure (typically a Class “A”
The URL can be used to link to this page
Your browser does not support the video tag.