Laserfiche WebLink
  <br />  <br />SSI DCPAGG END 00 01 0318 Page 1 of 2 <br />THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. <br /> <br />SUTTON SPECIALTY INSURANCE COMPANY <br /> <br />COMMERCIAL GENERAL LIABILITY POLICY <br /> <br />DESIGNATED CONSTRUCTION PROJECT(S) GENERAL AGGREGATE LIMIT <br /> <br />This endorsement modifies insurance provided under the following: <br /> <br />COMMERCIAL GENERAL LIABILITY COVERAGE PART. <br /> <br />Designated Project/Location to which this endorsement applies: <br />All Projects Scheduled with the Carrier. <br /> <br /> <br />As used herein, “Designated Projects/Location” includes only those properties and projects that are designated by you to us in writing, <br />and acknowledged and approved to you by Sutton Specialty Insurance Company, in writing in a Scheduled “Designated Project” <br />endorsement issued by and approved by Sutton Specialty Insurance Company in advance of the time any insured performs any work in, <br />on, or in connection with such property or project <br /> <br />A. For all sums which the insured becomes legally obligated to pay as damages caused by “occurrences” under Section I – Coverage <br />A, and for all medical expenses caused by accidents under Section I – Coverage C, which can be attributed only to ongoing operations <br />at a single designated construction project as Scheduled herein: <br /> <br />1. A separate Designated Construction Project General Aggregate Limit applies to each designated construction project, and that <br />limit is equal to the amount of the General Aggregate Limit shown in the Declarations. <br /> <br />2. The Designated Construction Project General Aggregate Limit is the most we will pay for the sum of all damages under Coverage <br />A, except damages because of “bodily injury” or “property damage” included in the “products-completed operations hazard”, <br />and for medical expenses under Coverage C regardless of the number of: <br /> <br />a. Insureds; <br /> <br />b. Claims made or “suits” brought; or <br /> <br />c. Persons or organizations making claims or bringing “suits”. <br /> <br />3. Any payments made under Coverage A for damages or under Coverage C for medical expenses shall reduce the Designated <br />Construction Project General Aggregate Limit for that designated construction project. Such payments shall not reduce the <br />General Aggregate Limit shown in the Declarations nor shall they reduce any other Designated Construction Project General <br />Aggregate Limit for any other designated construction project Schedule <br /> <br />4. The limits shown in the Declarations or provided for in this “policy” for Each Occurrence, Damage To Premises Rented To <br />You, Medical Expense or other applicable sublimit continue to apply. However, instead of being subject to the General <br />Aggregate Limit shown in the Declarations, such limits will be subject to the applicable Designated Construction Project <br />General Aggregate Limit. <br /> <br />B. For all sums which the insured becomes legally obligated to pay as damages caused by “occurrences” under Section I – Coverage <br />A, and for all medical expenses caused by accidents under Section I – Coverage C, which cannot be attributed only to ongoing <br />operations at a single designated construction project as Scheduled herein. <br />1. Any payments made under Coverage A for damages or under Coverage C for medical expenses shall reduce the amount <br />available under the General Aggregate Limit or the Products-completed Operations Aggregate Limit, whichever is <br />applicable; and <br />2. Such payments shall not reduce any Designated Construction Project General Aggregate Limit. <br />C. When coverage for liability arising out of the “products-completed operations hazard” is provided, any payments for damages <br />because of “bodily injury” or “property damage” included in the “products-completed operations hazard” will reduce the Products- <br />completed Operations Aggregate Limit, and not reduce the General Aggregate Limit nor the Designated Construction Project General <br />Aggregate Limit. <br />D. If the applicable designated construction project has been abandoned, delayed, or abandoned and then restarted, or if the authorized <br />contracting parties deviate from plans, blueprints, designs, specifications or timetables, the project will still be deemed to be the same <br />construction project. <br /> <br />Docusign Envelope ID: C32ED128-E8C0-4517-B42B-471D21968944