Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Draft EIR Air Quality <br /> <br /> <br />FirstCarbon Solutions 3.2-17 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec03-02 Air Quality.docx <br />actions; and (6) monitor emissions and verify results a minimum of every five years <br />starting in 2015. <br />Program 6.2 Adopt standard methodology for estimating greenhouse gas emissions from <br />development projects and utilize this methodology as part of the project review <br />process. <br />Program 6.3 For development approved prior to adoption of a Climate Action Plan, require the <br />following Best Management practices: BMP #1: Single- and multi-family residential <br />and commercial development to comply with the City of Pleasanton’s Green Building <br />Ordinance. As far as feasible, residential projects should incorporate: resource <br />efficient landscaping, energy-efficient hot water distribution systems; high efficiency <br />toilets and other low flow plumbing fixtures; high efficiency heating and cooling <br />systems; pre-plumbing for solar water heating; installation of wiring conduit for <br />future photovoltaic systems; installation of Energy Star appliances; and Green Points <br />in the Community Design and Planning category. BMP#2: Development shall <br />incorporate energy-efficient appliances and systems that meet Energy Star <br />standards. BMP#3: Where feasible, incorporate solar roofs (or other alternative <br />energy measures) into commercial development sufficient to meet 12.5 percent of <br />the building’s annual energy usage. Calculations of energy savings may be prepared <br />at the construction drawing stage. Where feasible, residential development to be <br />solar-ready, including proper solar orientation, electrical conduit installed for solar <br />electric system wiring, plumbing installed for solar hot water system, and space <br />provided for solar hot water storage tank. BMP#4: Require transit and <br />bicycle/pedestrian connections in new development, where feasible. For the <br />purposes of Program 6.2, development is defined as all multi-family residential <br />development with more than eight units, single-family homes with more than 2,000 <br />square feet, commercial development with more than 20,000 square feet, and <br />public projects. BMP#5: For commercial/industrial projects, prepare and implement <br />a voluntary Trip Reduction Plan, using the resources available through the City of <br />Pleasanton’s Transportation Systems Management program as described in Chapter <br />17.24 of the Pleasanton Municipal Code. Trip reduction goal of 15 percent within <br />five years and 25 percent within 10 years, compared to “business as usual.” BMP# 6: <br />Require priority facilities for alternative-fueled vehicles, such as priority parking and <br />recharging facilities, where feasible. BMP# 7: Development and demolition to <br />comply with the City’s Construction and Demolition Debris Ordinance (ordinance <br />currently in draft form). BMP# 8: In new commercial and multi-family projects, <br />include facilities to accommodate recycling consistent with the City’s programs. <br />BMP# 9: Incorporate “heat island” treatments that include cool roofs, cool <br />pavements, and/or strategically placed shade trees. Implement programs from the <br />Energy Element including those related to green building, such encouraging passive <br />solar construction, as well as those related to reducing energy from appliances, <br />equipment, and lighting. Implement programs from the Public Facilities and <br />Community Programs Element to reduce solid waste. Also implement the program in