Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Air Quality Draft EIR <br /> <br /> <br />3.2-22 FirstCarbon Solutions <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec03-02 Air Quality.docx <br />areas that have been identified via Statewide screening tools as having pollution and/or health <br />burden vulnerability, and areas that have low life expectancy. The proposed project is not located <br />within a CARE or AB 617-identified community. <br />The proposed project is not located within a Community Air Risk Evaluation (CARE) or AB 617- <br />identified community. <br />3.2.6 - Thresholds of Significance <br />The Lead Agency utilizes the criteria in the California Environmental Quality Act (CEQA) Guidelines <br />Appendix G Environmental Checklist to establish thresholds of significance to determine whether <br />impacts to air quality are significant environmental effects. As such, the City has determined that the <br />proposed project would have a potential impact if it would: <br />a) Conflict with or obstruct implementation of the applicable air quality plan. <br />b) Result in a cumulatively considerable net increase of any criteria pollutant for which the <br />project region is nonattainment under an applicable federal or State ambient air quality <br />standard. <br />c) Expose sensitive receptors to substantial pollutant concentrations. <br />d) Result in other emissions (such as those leading to odors) adversely affecting a substantial <br />number of people. <br /> <br />Consistency with Air Quality Management Plan <br />Impact AIR-1: The proposed project could conflict with or obstruct implementation of the <br />applicable air quality plan. <br />Impact Analysis <br />The BAAQMD has adopted several air quality policies and plans to address regional air quality <br />standards, the most recent of which is the 2017 Clean Air Plan. The 2017 Clean Air Plan was adopted <br />in April of 2017 and serves as the regional Air Quality Plan (AQP) for the Air Basin for attaining <br />NAAQS. The primary goals of the 2017 Clean Air Plan are to protect public health and protect the <br />climate. The 2017 Clean Air Plan acknowledges that the BAAQMD’s two stated goals of protection <br />are closely related. As such, the 2017 Clean Air Plan identifies a wide range of control measures <br />intended to decrease both criteria pollutants and GHG. The 2017 Clean Air Plan also accounts for <br />projections of population growth provided by the Association of Bay Area Governments (ABAG) and <br />Vehicle Miles Traveled (VMT) provided by the Metropolitan Transportation Commission (MTC) and <br />identifies strategies to bring regional emissions into compliance with federal and State air quality <br />standards. A project would be judged to conflict with or obstruct implementation of the 2017 Clean <br />Air Plan if it would result in substantial new regional emissions not foreseen in the air quality <br />planning process. <br />The BAAQMD does not provide a numerical threshold of significance for project-level consistency <br />analysis with AQPs. Therefore, the following criteria will be used for determining a project’s <br />consistency with the AQP.