Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Draft EIR Biological Resources <br /> <br /> <br />FirstCarbon Solutions 3.3-29 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec03-03 Bio Resources.docx <br />• A mechanism whereby the RMP shall be funded in perpetuity. Such a mechanism <br />would be the establishment by the applicant of a non-wasting endowment, <br />funded by the applicant and/or through monthly Homeowner Association (HOA) <br />fees. <br /> <br />MM BIO-1b Avoidance and Minimization Measures for the California Red-legged Frog <br />Avoidance and Minimization <br />Conduct protocol-level California red-legged frog (CRLF) surveys or assume presence <br />on-site. <br />Implementation of the following measures, partially summarized below, shall be <br />taken during construction to avoid harm or mortality to individual CRLF. <br />• Conduct protocol-level CRLF surveys or assume presence on the site. <br />• Prior to the start of construction, an approved qualified Biologist will train all <br />construction personnel regarding habitat sensitivity, identification of special- <br />status species, and required practices. <br />• Pre-construction surveys shall be conducted to ensure that CRLF are absent from <br />the construction area. If CRLF are present, they shall be relocated by a qualified <br />Biologist. <br />• The construction zone shall be cleared, and silt fencing shall be erected and <br />maintained around construction zones to prevent CRLF from moving into these <br />areas. <br />• A Biological Monitor shall be present on-site during times of construction, such as <br />any impacts to the creek, to ensure no CRLF are harmed, injured, or killed during <br />project buildout. <br /> <br />EACCS-specific CRLF Avoidance Minimization Measures: <br />• If aquatic habitat is present, a qualified Biologist shall stake and flag an exclusion <br />zone prior to activities. The exclusion zone shall be fenced with orange <br />construction zone and erosion control fencing (to be installed by construction <br />crew). The exclusion zone shall encompass the maximum practicable distance <br />from the work site and at least 500 feet from the aquatic feature wet or dry. <br />• A qualified Biologist shall conduct pre-construction surveys prior to construction <br />activities (before groundbreaking). If individuals are found, work shall not begin <br />until they are moved out of the construction zone to a United States Fish and <br />Wildlife Service (USFWS) or California Department of Fish and Wildlife CDFW-) <br />approved relocation site. <br />• A Service-approved Biologist shall be present for initial ground-disturbing <br />activities. <br />• If the work site is within the typical dispersal distance (contact USFWS/CDFW for <br />latest research on this distance for species of interest) of potential breeding <br />habitat, barrier fencing shall be constructed around the worksite to prevent