My WebLink
|
Help
|
About
|
Sign Out
_DEIR
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
12-10
>
ITEM 5 EXHIBIT A
>
_DEIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 3:54:34 PM
Creation date
12/2/2025 3:49:57 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
586
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Cultural Resources and Tribal Cultural Resources Draft EIR <br /> <br /> <br />3.4-30 FirstCarbon Solutions <br /> https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec03-04 Cultural-Tribal Cultural Resources.docx <br />Greek Orthodox Church Project includes a church that is more than 50 years old. However, potential <br />cumulative impacts would be mitigated at an individual project level by adherence to applicable <br />current State and federal laws and regulations, as well as other City and County laws, regulations, <br />and mitigations, such as adherence to standard conditions of approval that require monitoring of <br />construction sites in proximity to known resources (similar to as MM CUL-2a, e.g.). The combination <br />of these efforts would reduce potential cumulative impacts related to historical resources to a less <br />than significant level. Moreover, the proposed project would not have a considerably cumulative <br />contribution to this already less than significant impact because there are no known historic <br />resources that would be adversely impacted by the proposed project. <br />Based on the foregoing, the proposed project would not have a significant cumulative impact on any <br />historic resources. <br />Archaeological Resources <br />The geographic scope of the cumulative archaeological resources analysis is the project vicinity. This <br />is because archaeological resource impacts tend to be localized because the integrity of any given <br />resource depends on what occurs in the immediate vicinity around that resource, such as disruption <br />of soils, and the immediate vicinity provides the smallest geographic unit within which significant <br />cumulative impacts spanning multiple projects may occur. Therefore, in addition to the project site <br />itself, the area near the project site would be the area most affected by project activities (generally <br />within a 0.5-mile radius). For the purposes of this analysis, the geographic scope is defined as the <br />0.5-mile NWIC records search radius. As discussed above, the geographic scope for this cumulative <br />setting includes existing industrial, commercial and residential uses. One cumulative project shown <br />on Exhibit 3-1, Cumulative Projects Map, is within the 0.5-mile geographic scope. Moreover, <br />cumulative impacts to archaeological resources are limited to construction-related ground <br />disturbances. There is one archaeological resource recorded within this geographic scope, but none <br />are recorded within the project site; however, there is the possibility of previously unknown <br />archaeological resources that could be damaged or destroyed during subsurface construction <br />activities associated with cumulative projects. Accordingly, any such potential cumulative impacts <br />would be mitigated at an individual project level by adherence to applicable local, State, and federal <br />laws and regulations, as well as City and County laws, regulations, and the City ’s standard conditions <br />of approval, as well as project-specific mitigation as discussed in Section 3.4.4 and Section 3.4.6. <br />Accordingly, cumulative impacts would be less than significant. Additionally, the proposed project <br />would not have a cumulatively considerable contribution to the less than significant cumulative <br />impacts. As noted above, two reports address the project site specifically, indicating that it has <br />previously been surveyed for cultural resources and none were identified on-site. <br />For the reasons noted above, the proposed project would not have a cumulatively considerable <br />contribution to the less than significant cumulative impact on any known archaeological resources, <br />and potentially significant impacts to any previously unknown resources that could be damaged or <br />destroyed during project construction would be mitigated to less than significant by adherence to <br />applicable laws and regulations and compliance with the identified mitigation measures (MM CUL-2 <br />and COA CUL-3), which requires “on -call” monitoring during ground-disturbing construction, and <br />inadvertent discovery procedures. Therefore, the proposed project would not have a cumulatively
The URL can be used to link to this page
Your browser does not support the video tag.