My WebLink
|
Help
|
About
|
Sign Out
_DEIR
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
12-10
>
ITEM 5 EXHIBIT A
>
_DEIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 3:54:34 PM
Creation date
12/2/2025 3:49:57 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
586
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Draft EIR Geology, Soils, and Seismicity <br /> <br /> <br />FirstCarbon Solutions 3.6-21 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec03-06 Geology.docx <br />Priolo Earthquake Fault Zone, the site-specific soils and/or geotechnical report shall <br />address the impacts of seismic ground shaking on proposed structures, infrastructure, <br />and ground stability. <br />Program 2.2 Design and construct all structures to address potential seismic and geologic hazard <br />conditions according to the California Building Standards Code (CBC) standards or <br />more stringent standards. All structures and facilities not addressed by the CBC shall <br />be designed and constructed to mitigate potential seismic and geologic hazards as <br />recommended by site-specific soils, geologic, and/or geotechnical engineering <br />studies. <br />Program 2.5 Require technical review and analysis of soils, geologic, and geotechnical studies by a <br />qualified consulting engineering geologist reporting to the City of Pleasanton. <br />Incorporate the recommendations of the City’s consulting engineer into the project <br />design. <br />Program 2.6 Require professional inspection of foundations, piers, excavation, earthwork, and <br />other aspects of site development during construction. Ensure that all mitigations <br />recommended by the City’s consulting engineer are incorporated into the project <br />construction. <br />Policy 3 Require post-earthquake construction, if needed, to conform to all City codes and <br />ordinances. <br />Program 3.1 Require building permits and enforce all current building requirements and codes for <br />post-earthquake construction. <br />Goal 2 Minimize the risks to lives and property, and minimize potential liability to the City, <br />due to geologic hazards within the Plan Area. <br />Policy 5 Investigate the potential for geologic hazards as part of the development review <br />process, and maintain this information for the public record. <br />Program 5.1 Require site-specific soils studies for all new development prior to the issuance of <br />building permits and prior to the approval of final improvement plans. Where there is <br />risk of geologic hazards, the soil study should address seismic shaking, lateral <br />spreading, differential settlement, lurch cracking, liquefaction, erosion, and expansive <br />soils. <br />Program 5.2 Require site-specific geologic and/or geotechnical engineering studies prior to <br />development approval where there is risk of the following geologic hazards: surface <br />fault rupture, bank failures, rock falls, landslides, and for areas with slopes equal to or <br />greater than 20 percent. <br />Program 5.3 Require measures to mitigate potential geologic safety hazards during adverse <br />conditions such as saturated soils and ground shaking, and during grading of the site
The URL can be used to link to this page
Your browser does not support the video tag.