My WebLink
|
Help
|
About
|
Sign Out
_DEIR
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
12-10
>
ITEM 5 EXHIBIT A
>
_DEIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 3:54:34 PM
Creation date
12/2/2025 3:49:57 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
586
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Draft EIR Geology, Soils, and Seismicity <br /> <br /> <br />FirstCarbon Solutions 3.6-27 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec03-06 Geology.docx <br />to the direct or indirect loss, injury, or death involving landslides induced from strong seismic <br />shaking. <br />The implementation of Mitigation Measure (MM) GEO-1 would require a design-level geotechnical <br />investigation and the review of the proposed project ’s detailed structural, civil, and landscaping <br />plans by a qualified Geotechnical Engineer prior to the issuance of any grading or building permits to <br />ensure required recommendations are incorporated into the design. The qualified Geotechnical <br />Engineer would provide additional findings on any seismic or subsurface hazards that could directly <br />or indirectly result in the destruction to property or risk the injury or death of individuals residing on <br />the project site, including landslide hazards, and shall provide comments and recommendations on <br />any design measures that would be required to be incorporated into the proposed project to reduce <br />impacts related to landslides. Implementation of MM GEO-1 would require City verification of the <br />incorporation of recommended design features by the qualified Geotechnical Engineer prior to the <br />issuance of any building or grading permits. With MM GEO-1, the proposed project would not <br />directly or indirectly generate the risk of loss, injury, or death involving seismically induced <br />landslides. <br />Level of Significance Before Mitigation <br />Potentially significant impact. <br />Mitigation Measures <br />MM GEO-1 Design-level Geotechnical Study <br />Prior to the issuance of any building or grading permits, a design-level geotechnical <br />investigation on the project site and review of detailed site plans shall be performed by a <br />qualified Geotechnical Engineer. The design-level geotechnical investigation could <br />incorporate a variety of field methods and would include (but not be limited to) the <br />following items: <br />• Evaluating the lateral extent and depth of colluvial soils. <br />• Performing a seismic refraction survey to determine shear wave velocities at <br />deeper depths. <br />• Analyzing and developing slope grading and engineered buttress fill design <br />criteria. <br />• Evaluating upslope sources of water. <br />• Evaluating the Site Classification for Seismic Design. <br />• Estimating appropriate minimum building setbacks from the face of fill slopes. <br /> <br />The qualified Geotechnical Engineer would be required to demonstrate that <br />implementation of the recommendations would reduce potential impacts associated <br />with liquefaction and landslide potential to below a level of significance in conformance <br />with the standards in the California Building Standards Code (CBC). The applicant would <br />be required to incorporate all recommended design features into project building plans, <br />for review and approval by the City Engineer prior to the issuance of any building or <br />grading permits.
The URL can be used to link to this page
Your browser does not support the video tag.