My WebLink
|
Help
|
About
|
Sign Out
_DEIR
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
12-10
>
ITEM 5 EXHIBIT A
>
_DEIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 3:54:34 PM
Creation date
12/2/2025 3:49:57 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
586
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Draft EIR Executive Summary <br /> <br /> <br />FirstCarbon Solutions ES-32 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec00-03 Exec Summary.docx <br />Impacts <br />Level of Significance Before <br />Mitigation Mitigation Measures Level of Significance After Mitigation <br />3. Install tree protective fencing at the <br />edge of the TPZ. No grading, <br />construction, installation or other <br />activity is permitted within this area. <br />4. Stake the edge of grading along the East <br />Bay Regional Park District (EBRPD) <br />access road in order to review impacts <br />to trees. <br /> <br />Tree protection during construction: <br />1. Prior to beginning work, contractors <br />working near trees to be preserved shall <br />be required to meet with the Consulting <br />Arborist at the project site to review all <br />work procedures, access routes, storage <br />areas, and tree protection measures. <br />2. Any grading, construction, demolition or <br />other work that is expected to <br />encounter tree roots shall be monitored <br />by the Consulting Arborist. <br />3. If injury should occur to any tree during <br />construction, it shall be evaluated as <br />soon as possible by the Consulting <br />Arborist so that appropriate treatments <br />can be applied. <br />4. Fences have been erected to protect <br />trees to be preserved. Fences shall <br />remain until all site work has been <br />completed. Fences may not be <br />relocated or removed without <br />permission of the Project <br />Superintendent. <br />5. Construction trailers, traffic, and <br />storage areas shall remain outside <br />fenced areas at all times.
The URL can be used to link to this page
Your browser does not support the video tag.