Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Draft EIR Executive Summary <br /> <br /> <br />FirstCarbon Solutions ES-34 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec00-03 Exec Summary.docx <br />Impacts <br />Level of Significance Before <br />Mitigation Mitigation Measures Level of Significance After Mitigation <br />archaeological resource pursuant to Section <br />15064.5. <br />potential for exposing buried cultural <br />resources including prehistoric Native <br />American burials. <br />The project proponent shall retain a <br />Professional Archaeologist on an “on-call” <br />basis during ground-disturbing construction <br />for the project to review, identify and <br />evaluate cultural resources that may be <br />inadvertently exposed during construction. <br />The Archaeologist shall review and evaluate <br />any discoveries to determine whether they <br />are historical resource(s) and/or unique <br />archaeological resources under CEQA. <br />If any prehistoric or historic artifacts, or <br />other indication of cultural resources are <br />found once the project construction is <br />underway, all work shall stop within 20- <br />meters (66 feet) of the find. A qualified <br />Archaeologist shall be consulted for an <br />immediate evaluation of the find prior to <br />resuming groundbreaking construction <br />activities within 20 meters of the find. If the <br />find is determined to be an important <br />archaeological resource, the resource shall <br />be either avoided, if feasible, or recovered <br />consistent with the requirements of the <br />California Environmental Quality Act (CEQA) <br />Guidelines. <br />Impact CUL-3: The proposed project could disturb <br />human remains, including those interred outside of <br />formal cemeteries. <br />Less than significant impact. None. Less than significant impact. <br />Impact CUL-4: The proposed project could cause a <br />substantial adverse change in the significance of a <br />Potentially significant impact. Implement MM CUL-2 and COA CUL-3. Less than significant impact.