Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Draft EIR Executive Summary <br /> <br /> <br />FirstCarbon Solutions ES-37 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec00-03 Exec Summary.docx <br />Impacts <br />Level of Significance Before <br />Mitigation Mitigation Measures Level of Significance After Mitigation <br />Standards Code (CBC). The applicant would <br />be required to incorporate all recommended <br />design features into project building plans, <br />for review and approval by the City Engineer <br />prior to the issuance of any building or <br />grading permits. <br />Impact GEO-2: The proposed project would not <br />result in substantial soil erosion or the loss of <br />topsoil. <br />Less than significant impact. None. Less than significant impact. <br />Impact GEO-3: The proposed project would not be <br />located on a geologic unit or soil that is unstable, or <br />that would become unstable as a result of the <br />project, and potentially result in on- or off-site <br />landslide, lateral spreading, subsidence, <br />liquefaction or collapse. <br />Potentially significant impact. Implement MM GEO-1 Less than significant impact. <br />Impact GEO-4: The proposed project would not be <br />located on expansive soil, as defined in Table 18-1- <br />B of the Uniform Building Code (1994), creating <br />substantial direct or indirect risks to life or <br />property. <br />Potentially significant impact. Implement MM GEO-1 Less than significant impact. <br />Impact GEO-5: The proposed project would not <br />have soils incapable of adequately supporting the <br />use of septic tanks or alternative wastewater <br />disposal systems where sewers are not available <br />for the disposal of wastewater. <br />No impact. None. No impact. <br />Impact GEO-6: The proposed project would not <br />directly or indirectly destroy a unique <br />paleontological resource or site or unique geologic <br />feature. <br />Potentially significant impact. MM GEO-2a: Prior to the issuance of grading <br />permits, the project proponent/developer <br />shall demonstrate the retention of the <br />services of a qualified professional <br />Paleontologist as defined by the Society of <br />Vertebrate Paleontology (SVP). The qualified <br />Paleontologist shall prepare a <br />Paleontological Resource Impact Mitigation <br />Less than significant impact with <br />mitigation incorporated.