Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Draft EIR Executive Summary <br /> <br /> <br />FirstCarbon Solutions ES-41 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec00-03 Exec Summary.docx <br />Impacts <br />Level of Significance Before <br />Mitigation Mitigation Measures Level of Significance After Mitigation <br />identified and curated into a permanent <br />accredited repository (such as the University <br />of California Museum of Paleontology <br />[UCMP]) with permanent curation and <br />retrievable storage. <br />Cumulative Impact Less than significant impact. None. Less than significant impact. <br />Section 3.7—Greenhouse Gas Emissions <br />Impact GHG-1: The proposed project would not <br />generate greenhouse gas emissions, either directly <br />or indirectly, that may have a significant impact on <br />the environment. <br />Less than significant impact. None. Less than significant impact. <br />Impact GHG-2: The proposed project would not <br />conflict with any applicable plan, policy or <br />regulation of an agency adopted for the purpose of <br />reducing the emissions of greenhouse gases. <br />Less than significant impact. None. Less than significant impact. <br />Cumulative Impact Less than significant impact. None. Less than significant impact. <br />Section 3.8—Hazards and Hazardous Materials <br />Impact HAZ-1: The proposed project would not <br />create a significant hazard to the public or the <br />environment through the routine transport, use, or <br />disposal of hazardous materials. <br />Potentially significant impact. MM HAZ-1: The applicant shall retain a <br />licensed professional to conduct asbestos <br />and lead paint surveys. Prior to the issuance <br />of demolition permits for the two existing <br />residences and associated structures, the <br />applicant shall demonstrate removal of any <br />suspect asbestos-containing materials and <br />lead-based paint to the satisfaction of the <br />City. <br />Less than significant impact. <br />Impact HAZ-2: The proposed project would not <br />create a significant hazard to the public or the <br />environment through reasonably foreseeable upset <br />and accident conditions involving the likely release <br />of hazardous materials into the environment. <br />Less than significant impact. None. Less than significant impact.