My WebLink
|
Help
|
About
|
Sign Out
_DEIR
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
12-10
>
ITEM 5 EXHIBIT A
>
_DEIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 3:54:34 PM
Creation date
12/2/2025 3:49:57 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
586
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Draft EIR Executive Summary <br /> <br /> <br />FirstCarbon Solutions ES-47 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec00-03 Exec Summary.docx <br />Impacts <br />Level of Significance Before <br />Mitigation Mitigation Measures Level of Significance After Mitigation <br />Impact TRANS-3: The proposed project would not <br />substantially increase hazards due to a geometric <br />design feature (e.g., sharp curves or dangerous <br />intersections) or incompatible uses (e.g., farm <br />equipment). <br />Less than significant impact. None. Less than significant impact. <br />Impact TRANS-4: The proposed project would not <br />result in inadequate emergency access. <br />Less than significant impact. None. Less than significant impact. <br />Cumulative Impact Less than significant impact. None. Less than significant impact. <br />Section 3.15—Utilities and Service Systems <br />Impact UTIL-1: The proposed project would not <br />require or result in the relocation or construction <br />of new or expanded water, wastewater treatment <br />or stormwater drainage, electric power, natural <br />gas, or telecommunications facilities, the <br />construction or relocation of which could cause <br />significant environmental effects. <br />Less than significant impact. None. Less than significant impact. <br />Impact UTIL-2: The proposed project would have <br />sufficient water supplies available to serve the <br />project and reasonably foreseeable future <br />development during normal, dry and multiple dry <br />years. <br />Less than significant impact. None. Less than significant impact. <br />Impact UTIL-3: The proposed project would not <br />result in a determination by the wastewater <br />treatment provider which serves or may serve the <br />project that it has adequate capacity to serve the <br />project’s projected demand in addition to the <br />provider’s existing commitments. <br />Less than significant impact. None. Less than significant impact. <br />Impact UTIL-4: The proposed project would not <br />generate solid waste in excess of State or local <br />standards, or in excess of the capacity of local <br />infrastructure, or otherwise impair the attainment <br />of solid waste reduction goals. <br />Less than significant impact. None. Less than significant impact.
The URL can be used to link to this page
Your browser does not support the video tag.