My WebLink
|
Help
|
About
|
Sign Out
Appendix B - Air Quality - GHG Emissions and Energy Supporting Information COMBINED
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
12-10
>
ITEM 5 EXHIBIT A
>
Appendix B - Air Quality - GHG Emissions and Energy Supporting Information COMBINED
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 3:56:02 PM
Creation date
12/2/2025 3:55:25 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Hidden Canyon Residences and Preserve Custom Report, 3/6/2025 <br />37 / 45 <br />Remove — — — — — — — — — — — — — — — — — — <br />Subtotal — — — — — — — — — — — — — — — — — — <br />— — — — — — — — — — — — — — — — — — — <br />Annual — — — — — — — — — — — — — — — — — — <br />Avoided — — — — — — — — — — — — — — — — — — <br />Subtotal — — — — — — — — — — — — — — — — — — <br />Sequest <br />ered <br />— — — — — — — — — — — — — — — — — — <br />Subtotal — — — — — — — — — — — — — — — — — — <br />Remove <br />d <br />— — — — — — — — — — — — — — — — — — <br />Subtotal — — — — — — — — — — — — — — — — — — <br />— — — — — — — — — — — — — — — — — — — <br />5. Activity Data <br />5.1. Construction Schedule <br />Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description <br />Site Preparation (Demo + <br />Removal of Trees) <br />Demolition 1/5/2026 1/20/2026 5.00 12.0 — <br />Grading Grading 2/18/2026 4/7/2026 5.00 35.0 — <br />Building Construction Building Construction 4/2/2026 1/5/2028 5.00 460 — <br />Paving Paving 5/28/2027 6/10/2027 5.00 10.0 — <br />Architectural Coating Architectural Coating 6/26/2027 9/17/2027 5.00 60.0 — <br />5.2. Off-Road Equipment <br />5.2.1. Unmitigated <br />Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load FactorAppendix B 41
The URL can be used to link to this page
Your browser does not support the video tag.