My WebLink
|
Help
|
About
|
Sign Out
Appendix B - Air Quality - GHG Emissions and Energy Supporting Information COMBINED
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
12-10
>
ITEM 5 EXHIBIT A
>
Appendix B - Air Quality - GHG Emissions and Energy Supporting Information COMBINED
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 3:56:02 PM
Creation date
12/2/2025 3:55:25 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Hidden Canyon Residences and Preserve Custom Report, 3/6/2025 <br />40 / 45 <br />5.4. Vehicles <br />5.4.1. Construction Vehicle Control Strategies <br />Control Strategies Applied PM10 Reduction PM2.5 Reduction <br />Water unpaved roads twice daily 55%55% <br />Limit vehicle speeds on unpaved roads to 25 mph 44%44% <br />5.5. Architectural Coatings <br />Phase Name Residential Interior Area <br />Coated (sq ft) <br />Residential Exterior Area <br />Coated (sq ft) <br />Non-Residential Interior Area <br />Coated (sq ft) <br />Non-Residential Exterior Area <br />Coated (sq ft) <br />Parking Area Coated (sq ft) <br />Architectural Coating 207,062 69,021 0.00 0.00 21,379 <br />5.6. Dust Mitigation <br />5.6.1. Construction Earthmoving Activities <br />Phase Name Material Imported (Cubic <br />Yards) <br />Material Exported (Cubic <br />Yards) <br />Acres Graded (acres)Material Demolished (Ton of <br />Debris) <br />Acres Paved (acres) <br />Site Preparation (Demo + <br />Removal of Trees) <br />0.00 0.00 0.00 304 — <br />Grading 142,000 0.00 105 0.00 — <br />Paving 0.00 0.00 0.00 0.00 8.51 <br />5.6.2. Construction Earthmoving Control Strategies <br />Control Strategies Applied Frequency (per day)PM10 Reduction PM2.5 Reduction <br />Water Exposed Area 2 61%61% <br />5.7. Construction Paving <br />Appendix B 44
The URL can be used to link to this page
Your browser does not support the video tag.