Laserfiche WebLink
Hidden Canyon Residences and Preserve Custom Report, 3/6/2025 <br />40 / 45 <br />5.4. Vehicles <br />5.4.1. Construction Vehicle Control Strategies <br />Control Strategies Applied PM10 Reduction PM2.5 Reduction <br />Water unpaved roads twice daily 55%55% <br />Limit vehicle speeds on unpaved roads to 25 mph 44%44% <br />5.5. Architectural Coatings <br />Phase Name Residential Interior Area <br />Coated (sq ft) <br />Residential Exterior Area <br />Coated (sq ft) <br />Non-Residential Interior Area <br />Coated (sq ft) <br />Non-Residential Exterior Area <br />Coated (sq ft) <br />Parking Area Coated (sq ft) <br />Architectural Coating 207,062 69,021 0.00 0.00 21,379 <br />5.6. Dust Mitigation <br />5.6.1. Construction Earthmoving Activities <br />Phase Name Material Imported (Cubic <br />Yards) <br />Material Exported (Cubic <br />Yards) <br />Acres Graded (acres)Material Demolished (Ton of <br />Debris) <br />Acres Paved (acres) <br />Site Preparation (Demo + <br />Removal of Trees) <br />0.00 0.00 0.00 304 — <br />Grading 142,000 0.00 105 0.00 — <br />Paving 0.00 0.00 0.00 0.00 8.51 <br />5.6.2. Construction Earthmoving Control Strategies <br />Control Strategies Applied Frequency (per day)PM10 Reduction PM2.5 Reduction <br />Water Exposed Area 2 61%61% <br />5.7. Construction Paving <br />Appendix B 44